Loess Plateau Watershed Rehabilitation Project (World Bank, China), 1994 to 2005
- The record does not name which of my species, waters, soils or forests were harmed.
- International bodies Case study published by the World Bank (Chen, Wang and Wang, 2004): Severe droughts caused low survival rates requiring replanting, in some cases several times; shrubs on wasteland often had low survival rates and the component was cut back. World Bank (Public Disclosure Authorized)
- International bodies CSD-8 success-story page (World Bank InfoShop contact): Tree survival was generally high, except in drought-affected areas. United Nations (contact: World Bank InfoShop)
A World Bank-financed project in four Chinese provinces and regions built terraces, planted trees, shrubs and grass and constructed sediment dams on the Loess Plateau from 1994 to 2005. World Bank documents state a total investment of US$550 million for both phases and report erosion reductions of 57 million tons a year (first phase) and 107 million tons (both phases); the sources read contain no independent evaluation.
World Bank China Country Office Project Summary Note (undated); IBRD and IDA funding stated as US$300 million of the total. The first phase alone is stated as US$250 million in a World Bank case study.
Status As of the documents read (2004 case study; undated summary note; 2012 brief): the project ended in 2005; the figures on erosion, income and vegetation cover are those of the project and the World Bank; no independent evaluation was read.
- Farmers in the project area — Grain output from 427,000 to 700,000 tons and net income per capita from Yuan 360 to Yuan 1,263 (case study); 2.5 million people lifted out of poverty (summary note) World Bank (Public Disclosure Authorized)
What happened
The Loess Plateau Watershed Rehabilitation Project was financed by the World Bank's International Development Association (IDA) and carried out by the People's Republic of China, through its Ministry of Water Resources and the provinces of Gansu, Shaanxi and Shanxi and the Inner Mongolia Autonomous Region. A World Bank-published case study presented at a Shanghai conference in May 2004 (by Chen Shaojun, Wang Yue and Wang Yijie, who state that the findings are their own) records that the first phase was launched in 1994 and completed in 2002, covered 1,560,000 hectares in 21 counties, and cost US$250 million, of which an IDA credit of US$150 million covered 60 percent; it also states a total investment of Yuan 2.1 billion. A World Bank China Country Office summary note states that the project ran in two phases from 1994 to 2005 across 48 counties, about 30,000 km2, with "Total investment costs amounted to US$ 550 million" and IBRD and IDA funding of US$300 million.
The case study lists components of the first phase: terraces (90,500 ha), forestation (90,900 ha), shrubs (136,000 ha), economic forestation (26,700 ha), orchards (30,890 ha), grasslands (100,140 ha), irrigation (7,100 ha) and sediment control dams (149 key dams, 1,140 warping dams and 1,956 check dams). It records that local authorities restricted free grazing of sheep and goats in the project areas and beyond, and that land was contracted to farmers, with land-use rights of 30 to 50 years according to the summary note.
The case study reports, from the project's own side, that annual grain output rose from 427,000 tons to 700,000 tons, fruit output from 80,000 to 345,000 tons and net income per capita from Yuan 360 to Yuan 1,263, that "soil erosion from Loess Plateau area has been reduced by annual 57 million tons", and that the economic rate of return was 29 percent with environmental and downstream benefits and 19 percent with on-site benefits only. It records that the population below the poverty line in the project area fell from 59 percent in 1993 to 27 percent in 2001. The summary note reports vegetation cover rising from 17% to 33%, annual soil erosion down by more than 107 million tons, 920,000 ha rehabilitated and 2.5 million people lifted out of poverty.
On trees, the case study states that "Severe droughts caused low survival rates requiring replanting, in some cases several times" and that "Shrubs planted on wasteland often had low survival rates and this component was cut back". A UN success-story page whose contact is the World Bank InfoShop states that "Tree survival was generally high, except in drought-affected areas". Feng and colleagues (Nature Climate Change, 2016), writing about revegetation across the Loess Plateau under the Grain to Green programme rather than about this project, reported that net primary productivity was already close to an estimated water-supply limit.
- 1994First phase launched (October, per the case study); IDA credit of US$150 million
- 2002First phase completed (case study)
- 2004World Bank-published case study presented at the Shanghai conference on scaling up poverty reduction (May)
- 2005Second phase ends; two phases ran 1994 to 2005 across 48 counties (summary note)
- 2012IFPRI Focus brief describes the project as having benefited more than 3 million farmers
- 2016Feng et al. publish a Nature Climate Change study of Loess Plateau revegetation and water limits
What was said
“one of the largest and most successful erosion control programs in the world”
“exceed expectations in most respects”
“Severe droughts caused low survival rates requiring replanting, in some cases several times”
“a thriving, lush ecosystem providing improved livelihoods for more than 3 million farmers and their families”
“NPP in this region is found to be already close to this limit.”
Where accounts differ
Each party's account, side by side, with its source. The record does not settle these points; it shows them.
Severe droughts caused low survival rates requiring replanting, in some cases several times; shrubs on wasteland often had low survival rates and the component was cut back.
World Bank (Public Disclosure Authorized)Tree survival was generally high, except in drought-affected areas.
United Nations (contact: World Bank InfoShop)How it looked
Shown
- Project described as "one of the largest and most successful erosion control programs in the world", with 2.5 million people lifted out of poverty and vegetation cover up from 17% to 33%.World Bank China Country Office, Project Summary Note · World Bank
- Project described as "the largest and most successful water and soil conservancy project in the world" with an economic rate of return of 29 percent including environmental and downstream benefits.Case study published by the World Bank (Chen, Wang and Wang) · World Bank (Public Disclosure Authorized)
Recorded
- Total project cost US$250 million for the first phase with an IDA credit of US$150 million; total investment US$550 million for both phases (World Bank documents).
- Outputs of the first phase against the appraisal projection: 149 key dams (236 projected), 1,140 warping dams (2,208 projected), 1,956 check dams (3,417 projected); terraces 90,446 ha (83,200 projected); grassland 100,411 ha (155,000 projected).
- First-phase case study: low tree survival in drought, shrub component cut back; UN success-story page: tree survival generally high except in drought-affected areas.
- No independent evaluation of the project was read; the figures on erosion, income and vegetation cover are those of the project's implementers and the World Bank.
In nature's name
Promised
- “The primary objective of the project was to increase agricultural production and incomes on 1,560,000 hectares of land in the Loess Plateau in nine tributary watersheds of the Yellow River.” — Case study published by the World Bank (Chen, Wang and Wang) (May 2004) World Bank (Public Disclosure Authorized)
Money moved in nature's name
| What | Kind | Amount | Period |
|---|---|---|---|
| IDA credit for the first phase World Bank (IDA) World Bank (Public Disclosure Authorized) | Pledged | $150m | 1994-2002 |
| Total project cost, first phase World Bank and Government of China World Bank (Public Disclosure Authorized) | Budget | $250m | 1994-2002 |
| Total investment of the first phase, stated separately in yuan World Bank and Government of China World Bank (Public Disclosure Authorized) | Budget | ¥2.1bn | 1994-2002 |
| IBRD and IDA funding, both phases World Bank (IBRD and IDA) World Bank | Paid out | $300m | 1994-2005 |
| Total investment costs, both phases World Bank and Government of China World Bank | Spent | $550m | 1994-2005 |
What was measured
The erosion, vegetation and income figures in the documents read are those of the project and the World Bank (a case study published by the Bank and a Bank summary note); they are not an independent measurement. The World Bank's Independent Evaluation Group report on the second phase was not available. Feng et al. (2016) measured revegetation across the Loess Plateau but do not evaluate this project.
Operation Ended · First phase completed in 2002; the two phases ran 1994 to 2005. World Bank
Findings on record
- Own admission Case study published by the World Bank (Chen, Wang and Wang) (2004-05) · The Loess Plateau Watershed Rehabilitation Project, Scaling Up Poverty Reduction conference case study: “Severe droughts caused low survival rates requiring replanting, in some cases several times” World Bank (Public Disclosure Authorized)
- Peer-reviewed study Feng et al. (Nature Climate Change) (2016) · Revegetation in China's Loess Plateau is approaching sustainable water resource limits (plateau-wide revegetation, not an evaluation of this project): “NPP in this region is found to be already close to this limit.” Chengdu Institute of Biology, Chinese Academy of Sciences
Who gained
Reached nature or the ground
Gained elsewhere
Responses on record
- World Bank (May 2004; undated): Published a case study and a summary note describing the project as among the largest and most successful erosion control programmes in the world, with an economic rate of return of 29 percent including environmental and downstream benefits. · World Bank (Public Disclosure Authorized)
- Ministry of Water Resources (China): The case study names the Ministry's Water Conservation Department as the implementing agency contact; no statement of its own is recorded in the sources read.
In court and with insurers
Lawsuits and rulings
Insurers
What nature saw
Nature's report opens this page. Below: further outcomes measured on the ground.
What we don't know
Nature
- Not measured Harm to nature: No independent ecological evaluation is on record.
- Disputed Tree survival in the project area
Figures
- Self-reported only Soil erosion reduction tons per year: Case study; the project's own figure.
- Self-reported only Soil erosion reduction tons per year: Summary note; the project's own figure.
Record
- None on record None on record: an independent evaluation of the project's ecological results in the sources read. The World Bank's Independent Evaluation Group listed a Project Performance Assessment Report (No. 41122, 4 October 2007) covering the Second Loess Plateau Watershed Rehabilitation Project; its text was not available.
- None on record None on record: the date of the World Bank China Country Office summary note; the page gives no date.
- Unclear Unclear: the number of counties and the area covered. The case study gives 21 counties and 1,560,000 hectares for the first phase; the summary note gives 48 counties and about 30,000 km2 for both phases and 35,080 km2 over which results were measured.
- Unclear Unclear: the first-phase cost. The case study states US$250 million with an IDA credit of US$150 million and, separately, Yuan 2.1 billion; the sources do not reconcile the currencies.
Did the harm stop?
Who paid?
IDA credit of US$150 million for the first phase and IBRD and IDA funding of US$300 million for both phases, with the balance of the stated total investment (US$250 million first phase; US$550 million both phases) borne by China; the split of the balance is not stated in the documents read.
Sources
Government and regulators
- The Loess Plateau Watershed Rehabilitation Project (case study; Chen Shaojun, Wang Yue, Wang Yijie), Scaling Up Poverty Reduction conference, ShanghaiWorld Bank (Public Disclosure Authorized) · 2004-05
Researchers
- Rehabilitating China's loess plateau (John Mackedon), IFPRI Focus 19, Brief 5International Food Policy Research Institute via CGSpace · 2012-06
- Revegetation in China's Loess Plateau is approaching sustainable water resource limits (Feng et al.), Nature Climate Change 6(11): 1019-1022 (abstract reprinted)Chengdu Institute of Biology, Chinese Academy of Sciences · 2016
International bodies
- Loess Plateau Watershed Rehabilitation Project, CSD-8 Sustainable Development Success StoriesUnited Nations (contact: World Bank InfoShop) ·
Connected cases
- Chad–Cameroon pipeline and Doba oil fields: World Bank conditions, revenue law, Inspection Panel and 2023 nationalisation Chad · 1999–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Lender; set the revenue-law and safeguard conditions; withdrew in 2008
- World Bank Independent Evaluation Group (IEG) (International organisation) — here: Issued Project Performance Assessment Report No. 41122 on the second phase (not read); there: Evaluated the programme in 2009
- 1991 World Bank memo signed by Lawrence Summers on pollution in Africa Africa (regional) · 1991–1993
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Institution that issued the internal memo
- Afforestation of the dried Aral Sea bed in Uzbekistan Uzbekistan · 2018–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Donor of the restoration-value study
- Amazon Region Protected Areas programme (ARPA) and the ARPA for Life Transition Fund, Brazil Brazil · 2002–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Channel for GEF funding to ARPA
- Burkina Faso Forest Investment Program project: 3.78 million tCO2eq in emission reductions estimated with an ex-ante tool Burkina Faso · 2014–2021
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Administered the grants; completion report and rating
- Cambodia fills Phnom Penh's Boeung Kak lake with sand under 99-year lease Cambodia · 2007–2011
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: lender whose land-titling programme was reviewed
- Canaima National Park: fire suppression for the Guri catchment, mining pressure and the UNESCO decisions Venezuela · 1981–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Implementing agency of GEF project 2103
- China is building a mega dam in Tibet, upstream of India and Bangladesh China · 2024
- Government of China (Government) — here: Borrower and co-investor; there: Building the dam, per Radio Free Asia
- China small hydropower closures, Yangtze Economic Belt China · 2018–2020
- Ministry of Water Resources (China) (Government) — here: Implementing agency of the project; there: Regulator that reported the rectification
- China's Grain for Green (Sloping Land Conversion) Programme China · 1999–2026
- Government of China (Government) — here: Borrower and co-investor; there: Runs and funds the programme from the central budget
- China's natural forest logging ban and the shift of timber imports China · 1998–2014
- Government of China (Government) — here: Borrower and co-investor; there: introduced the 1998 logging restrictions and the natural-forest logging ban
- China's Three-North Shelterbelt Programme ("Green Great Wall"), 1978 to 2050 China · 1978–2026
- Government of China (Government) — here: Borrower and co-investor; there: Runs and funds the programme from the central budget
- Destruction of the Kakhovka dam and drainage of the Kakhovka reservoir (June 2023) Ukraine · 2023–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Co-author of RDNA3 and RDNA4
- Electricity and diesel for groundwater pumping in Iran: subsidies and payments Iran · 2014–2024
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Published the 2023 diagnostic citing the IMF subsidy estimate
- Fengyun-1C anti-satellite test China · 2007–2026
- Government of China (Government) — here: Borrower and co-investor; there: State that conducted the test
- Fukushima treated water discharge and Chinese seafood ban Japan · 2023–2025
- Government of China (Government) — here: Borrower and co-investor; there: Banned Japanese seafood imports
- Global Biodiversity Framework Fund (GBFF), hosted by the GEF Global · 2023–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Trustee
- Global Environment Facility Trust Fund: replenishments and independent evaluation Global · 1991–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Trustee of the GEF Trust Fund; Agency
- Great Green Wall: USD 19bn tracked, USD 2.5bn disbursed by March 2023, and a restored area reported at between 1.66 and almost 18 million hectares Sahel (11 countries) · 2007–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Committed USD 5.6bn in the 11 countries
- Green Belt Movement and Karura Forest, Kenya Kenya · 1977–2023
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Signed a carbon-credit agreement with the Green Belt Movement
- Ho Chi Minh City canal restoration demolished about 7,000 households Vietnam · 1993–2012
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: lender of the first-phase loan
- Human Rights Watch reports about 930,000 relocated in Tibet for ecological protection China · 2024
- Government of China (Government) — here: Borrower and co-investor; there: authority that carried out the relocations, as reported
- Ili River and Lake Balkhash: inflow from China, Kapshagay releases and a French-funded master plan Kazakhstan · 2024–2026
- Government of China (Government) — here: Borrower and co-investor; there: Upstream state on the Ili; counterpart in the draft agreement
- India's 1975–77 Emergency sterilisation drive drew a $66 million World Bank loan India · 1975–1977
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Lender
- Iran associated-gas flaring and flare-gas recovery contracts Iran · 2012–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Publishes the satellite-based flare estimates and tracker report
- Jamaica catastrophe bonds and the Hurricane Melissa payout Jamaica · 2021–2025
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Issuer and arranger of the catastrophe bonds
- Jamaica's World Bank catastrophe bond did not pay after Hurricane Beryl Jamaica · 2024
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Brokered the bond
- Lagos waterfront evictions (Otodo-Gbame, Badia East) and Eko Atlantic Nigeria · 2014–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Funder of a project in the Badia East area
- Mauritania fishmeal industry, sardinella stocks and foreign fishing agreements Mauritania · 2008–2026
- Government of China (Government) — here: Borrower and co-investor; there: Embassy in Nouakchott defended the Poly-Hondone agreement
- Mbeubeuss landfill plan to hire 500 of more than 3,000 waste pickers Senegal · 2025
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: finances the Mbeubeuss rehabilitation, as reported
- Mekong sand mining (Cambodia, Vietnam) Cambodia and Vietnam · 2007–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Inspection Panel finding on Boeung Kak land titling; lending freeze 2011
- Mekong upstream dams and the decline of Tonle Sap flow reversal Cambodia · 1962–2026
- Government of China (Government) — here: Borrower and co-investor; there: Operator of the upper Mekong (Lancang) dams; rejected the 2019 low-flow attribution
- Mongolia index livestock insurance Mongolia · 2024
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Author of the presentation describing the programme
- Multilateral Fund for the Implementation of the Montreal Protocol Global · 1991–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Implementing agency named in the 2004 evaluation
- Nepal community forestry Nepal · 2000–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Funder of carbon payments (Forest Carbon Partnership Facility)
- Non-peer-reviewed study links China's 1958 sparrow campaign to famine deaths China · 1958–1960
- Government of China (Government) — here: Borrower and co-investor; there: ran the Four Pests campaign
- Olkaria geothermal projects (Kenya) Kenya · 2013–2017
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Financier; its Inspection Panel reviewed the resettlement
- Rabobank co-financed a Brazilian eucalyptus carbon plantation contested by locals Brazil · 2003–2008
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: operator of the carbon fund
- Sengwer evictions from Embobut forest and the EU Water Towers programme (Kenya) Kenya · 2014–2024
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Funder of an earlier forest project (2007)
- Sri Lanka fertiliser ban Sri Lanka · 2021
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Source of the paddy yield figure
- Tree felling under the Tashkent moratorium: damage assessments, prosecutor cases and ministry counts Uzbekistan · 2020–2025
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Tashkent air quality assessment (context)
- Ukraine's mine contamination, the farmland demining programme and mine-action money Ukraine · 2022–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: RDNA damage and needs assessments
- Ulaanbaatar winter air pollution: stove programmes, the 2019 raw-coal ban and subsidised briquettes Mongolia · 2008–2024
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Ulaanbaatar Clean Air Project
- Uzbek cotton boycott ends forced labour Uzbekistan · 2017–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Lender (USD 800 million, October 2025)
- Venezuela gas flaring and methane from oil and gas Venezuela · 2012–2026
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Publishes the Global Gas Flaring Tracker; changed its method in June 2026
- Venezuela tree cover loss, 2001–2024, and international forest finance Venezuela · 2001–2024
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Agency for GEF project 2103
- World Bank $100m plastic waste bond tied to Verra credit sales Multiple countries · 2024
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: issuer of the bond
- World Bank $800m Uzbekistan operation; Tanzania project halted Uzbekistan · 2017–2025
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: lender; policy operation and REGROW financier
- World Bank and development bank accountability mechanisms: Embobut (Sengwer), Tata Mundra, Arun III, Jale, Cambodia Kenya · 2007–2024
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Funder of the Kenya project; hosts the Inspection Panel
- World Bank inspection panel registers complaint over Rogun dam financing Tajikistan · 2024–2025
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: financier
- World Bank REGROW project, Ruaha National Park Tanzania · 2017–2025
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Financier of the REGROW project
- World Bank US$600m farm loan coincided with a 90% fall in farm support Turkey · 2001–2003
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Lender of the US$600m loan
- World Bank-backed Colombo flood work turned Beddagana wetland into a park Sri Lanka · 2010–2018
- World Bank (International organisation) — here: Financed the project through an IDA credit and IBRD funding and published the case study and summary note; there: Funder whose support backed the programme
- World Bank-backed dams displaced people, and reviews found incomes often not restored Global · 1985–2018
- Government of China (Government) — here: Borrower and co-investor; there: Host government for the Three Gorges dam
- Yangtze ten-year fishing ban China · 2020–2030