In 1974 I covered roughly 590 square kilometres, according to NASA Landsat images.
Did nature suffer? Yes. Harm is on record. Accounts differ ↓
In my name
Recorded
Details not on record: 3 none on record · 1 insufficient · 1 not measured · 6 disputed See the gaps
Accounts of the harm differ
Why the lake dried and whether upstream water use contributed
Whether the lake has recovered since the efforts begun in 2009
  • Government and regulators Tidiani Ascofare, Government of Mali restoration lead (2009), as quoted by UNEP: Farmed land around the lake would rise from 100 hectares in 2006 to more than 20,000 hectares in 2009. UNEP - UN Environment Programme
  • International bodies World Food Programme (14 December 2009): The lake, "which three years ago was dry and surrounded by advancing desert, has again become an area of fertile land around a system of lakes offering water for pastoralists and a plentiful supply of fish". World Food Programme (via ReliefWeb)
  • International bodies UN Environment Foresight Brief (August 2017): "there seems to be no recovery as can be seen in the 2016 image". UN Environment, Science Division
  • Communities and civil society ICRC (28 September 2021): Describes a cracked lake bed; a farmer says the little water reaching the pond serves only to grow enough to survive. International Committee of the Red Cross (ICRC Newsroom)
When the lake dried
  • International bodies UN News (2008) and UNEP (2016): Almost totally dry since the 1970s; droughts of the 1970s dried the lakes over seven years. UN News
  • International bodies NASA Earth Observatory (2008): A drop in precipitation steadily dried the lake from the late 1980s. NASA Earth Observatory
  • Researchers Groupe URD (2020): Complete drying of the lake in 1983; dry years of 1910, 1924, 1941, 1974 and since 1983. Groupe URD for the Agence Française de Développement
  • International bodies UN Environment Foresight Brief (2017): The lake dried completely in 1914, 1924 and 1944 (citing Pérez, Fernández and Gatti, 2010). UN Environment, Science Division

In 2008 UNEP began a project, at the request of the Government of Mali, to rehabilitate the Lake Faguibine ecosystem near Timbuktu and re-flood about 600 square kilometres. The project's cost is stated as USD 1 million (UNEP fact sheet, Norway as donor), more than USD 12 million (2008), USD 15 million (UNEP, 2017) and about USD 40 million for a reformulated version; activities were halted by insecurity in 2011, and UNEP's 2017 brief reports no recovery of the lake in its 2016 image.

about 90 km2Flooded surface area of the Faguibine system in 2010
Hamerlynck and colleagues (African Journal of Aquatic Science, 2016) give about 1 000 km2 in the late 19th century and some 90 km2 in 2010; NASA gives roughly 590 km2 for the lake in 1974. No later measured flooded area was found in the sources reviewed.

Status As of the latest source reviewed (UNEP Foresight Brief, August 2017): second-phase activities begun in 2011 were halted by insecurity, a reformulated project was reported in 2016, and the lake showed no recovery in the 2016 image; no later UNEP document was found.

What?
UNEP began in 2008 a project, at Mali's request, to rehabilitate the Lake Faguibine ecosystem and re-flood about 600 square kilometres; second-phase activities begun in 2011 were halted by insecurity and UNEP reported a reformulation in 2016. UNEP - UN Environment Programme
Where?
Lake Faguibine system, 80 km west of Timbuktu, Tombouctou region, Goundam cercle, northern Mali. UNEP - UN Environment Programme
When?
Project begun 2008 (fact sheet 2008 to 2015); launch 2009 per UNEP's 2017 brief; second phase 2011 halted; reformulation reported June 2016; brief August 2017. UN Environment, Science Division
Who?
Gained
Lost
  • Farmers, herders and fishers around the lake — UNEP estimates that the livelihoods of up to 200,000 people were affected by the drying UN Environment, Science Division
Harmed
Why?
Droughts of the 1970s, sand in the feeder channels, climate change and upstream irrigation and hydropower use are given by UNEP; other sources give different attributions (see disputes). UNEP - UN Environment Programme
How?
Planned activities included quantifying ecosystem services, dredging over two million cubic metres of sand from the channels, awareness-raising upstream and downstream and building national capacity; funding from Norway and, later, UEMOA. United Nations Environment Programme
6 of 6 questions (what, who, where, when, why, how) have an answer on record

What happened

The record, in order.

The Faguibine system is a series of five interlinked lakes (Télé, Takara, Gouber, Kamango and Faguibine) in the Tombouctou region of northern Mali, fed by overflows of the Niger. UNEP's 2017 Foresight Brief gave a full-lake area of approximately 590 km2 and a shoreline of 213 kilometres (citing Lakepedia); NASA Earth Observatory wrote in August 2008 that the lake covered roughly 590 square kilometres in 1974 and that "Starting in the late 1980s, a drop in precipitation steadily dried the lake". Hamerlynck and colleagues reported that the flooded surface area fell from about 1 000 km2 in the late 19th century to some 90 km2 in 2010, with flood extent depending on the height of the Niger flood peak at Diré. UN News wrote in October 2008 that the lake "has been almost totally dry since the 1970s". UNEP's brief estimated that the livelihoods of up to 200,000 people were affected, citing a 2010 IUCN publication, and said the annual floods once supported fishing, pasture and over 60,000 ha of agriculture, citing IRIN News (2008). A 2011 economic evaluation, cited by Hamerlynck and colleagues, found net income of US$100 000 per year per flooded km2.

The sources give different causes. UNEP wrote in 2016 that droughts in the 1970s dried the lakes, that sand then filled the channels linking them to the Niger, that climate change had brought erratic rainfall and the southward advance of the Sahara, and that "Upstream, people use the water for large-scale irrigation and to produce hydropower". UNEP's 2017 brief added that the Sélingué dam "has already reduced the amount of water flooding the Inner Niger Delta" and that further declines were expected once the Fomi Dam in Guinea and two planned upstream irrigation schemes were built. A study by Groupe URD for the French Development Agency (AFD) reported that Mali's national hydraulics directorate had rejected, in studies of 1987 and 1995, any role for the Sélingué and Markala dams in the fall in Niger flows, and that no study had evaluated the real impact of upstream pumping. Hamerlynck and colleagues attributed a phase shift around the year 2000 to a delayed consequence of the 1970s drought compounded by a collapse of societal controls on water use during civil conflict.

In June 2008 the Government of Mali asked the United Nations system for support in rehabilitating the system; a UNEP pre-identification mission took place in August 2008 (Groupe URD's account of UNEP's intervention). UN News reported on 6 October 2008 that UNEP Executive Director Achim Steiner had spotlighted the lake at the World Conservation Congress in Barcelona, that the rehabilitation was "expected to cost more than $12 million" and that "Several donor countries have signalled interest in taking the work forward in cooperation with Mali, UNEP and other partners". UNEP's project fact sheet, undated and read from a December 2009 archive capture, gave the duration as 2008 to 2015, the donor as the Government of Norway and the budget as USD 1 million. Its stated objectives were to restore the ecosystem functioning of the lake, to raise awareness on preventing conflicts between farmers and livestock keepers and to strengthen Mali's capacity for a national policy dialogue on water; its main activities included quantifying the potential of the lake's ecosystem services and dredging over two million cubic metres of sand blocking the feeder channels. UNEP's 2017 brief described a "US $15 million Lake Faguibine ecosystem restoration project" launched by UN Environment and other development partners in 2009.

UNEP's 2016 story reported that retired Col. Tidiani Ascofare, who led the government's restoration effort, said in a 2009 interview that only 100 hectares around the lake were farmed in 2006 and that the figure would be more than 20,000 hectares in 2009, and that the World Food Programme had reported in December 2009 on a UNEP-supported food-for-work programme which opened the channels "for a while at least". The brief said that in 2011 UN Environment and the West African Economic and Monetary Union (UEMOA) started a second phase but halted activities because of insecurity. UNEP's 2016 story said the project had faced challenges "mainly due to the difficult security situation since 2011" and that, "with additional funding from the West African Economic and Monetary Union (UEMOA) of $5.23 million", UNEP was reviving it; the reformulated project, "around $40 million when fully funded", was to form part of a broader UN-led programme addressing infrastructure and socio-economic interventions, with UNEP's component on the health and productivity of the lake's ecosystems.

The brief of August 2017 carried four satellite panels labelled 1994-1978, 1987, 2001 and 2016 and the caption "After rehabilitation efforts initiated in 2009, there seems to be no recovery as can be seen in the 2016 image." It also noted that a reforestation programme of the 1980s had left high-density forest covering about 30 per cent of the former lake area, and named restoration of the lake ecosystem as the best option for the communities. Later accounts describe the area as dry or mostly dry: the Groupe URD study (fieldwork November 2019 to February 2020) reported that recent water levels allowed only occasional flooding of the south-east of the lake and that a flood in 2019 reached land long used for grazing, and the International Committee of the Red Cross (ICRC) described in September 2021 a lake bed of cracked earth, buried houses and a closed school. No UNEP evaluation of the project and no UNEP document after August 2017 were found in the sources reviewed.

  1. 1974NASA Earth Observatory: the lake covered roughly 590 square kilometres (Landsat images of January 1974 and December 1978)
  2. 1983Groupe URD: complete drying of the lake; since then Niger inflows have remained too weak to refill it
  3. 1986Norway-financed programme via the UN Sudano-Sahelian Office begins channel and fixation works (to 1990), as listed by Groupe URD
  4. 2008June: Government of Mali asks the UN system for support; August: UNEP pre-identification mission; 6 October: UN News reports an expected cost of more than $12 million
  5. 2009Project launched (UNEP's 2017 brief: a US $15 million project); December: WFP reports on a UNEP-supported food-for-work programme; retired Col. Ascofare says 20,000 hectares will be farmed in 2009 against 100 in 2006
  6. 2010Flooded surface area of the system about 90 km2 (Hamerlynck et al., 2016)
  7. 2011UNEP and UEMOA start the second phase; activities halted because of insecurity
  8. 2016UNEP story (28 June): UEMOA additional funding of $5.23 million and a reformulated project of around $40 million when fully funded; satellite image of 2016 shows no recovery according to UNEP's 2017 brief
  9. 2017UN Environment Foresight Brief "Saving Lake Faguibine" (August) reports no recovery in the 2016 image
  10. 2021ICRC (28 September) describes cracked ground where the lake was, buried houses and a closed school at Bintagoungou

What was said

Claims, in the words of those who made them.

“invest and re-invest in the 'soft' infrastructure too”

Achim Steiner, UNEP Executive Director, at the Fifth World Conservation Congress · 6 October 2008 · UN News

“I am an orphan of this dead lake because I lived and flourished by the lake when it was a wonderful place for fishermen and farmers and pastoralists.”

A community leader at Lake Faguibine, as recounted in a 2008 diary entry by Jan Egeland, then UN Secretary-General's Special Adviser on conflict, quoted by UNEP · 2008 · UNEP - UN Environment Programme

“In 2006, only 100 hectares of land around the lake was farmed. This year [2009] it will be more than 20,000 hectares.”

Tidiani Ascofare, retired colonel leading the Government of Mali's efforts to restore the lake, interviewed by UNEP expert Levis Kavagi · 2009 · UNEP - UN Environment Programme

“Implementation of the project has faced challenges mainly due to the difficult security situation since 2011.”

“After rehabilitation efforts initiated in 2009, there seems to be no recovery as can be seen in the 2016 image.”

“Toute cette zone était remplie d'eau.”

Where accounts differ

Each party's account, side by side, with its source. The record does not settle these points; it shows them.

Cost and size of the project
International bodies
UNEP, project fact sheet (undated, 2008–2015)

Budget USD 1 million; donor Government of Norway.

United Nations Environment Programme
International bodies
UN News, 6 October 2008

The rehabilitation was "expected to cost more than $12 million"; several donor countries had signalled interest.

UN News
International bodies
UN Environment Foresight Brief, August 2017

In 2009 UN Environment and other development partners launched the "US $15 million Lake Faguibine ecosystem restoration project".

UN Environment, Science Division
International bodies
UNEP story, 28 June 2016

The reformulated project was "around $40 million when fully funded", with additional UEMOA funding of $5.23 million.

UNEP - UN Environment Programme
Why the lake dried and whether upstream water use contributed
International bodies
UNEP (2016)

Droughts in the 1970s, sand filling the channels, climate change, and upstream large-scale irrigation and hydropower use combined to deprive the lake of water.

UNEP - UN Environment Programme
International bodies
UN Environment Foresight Brief (2017)

The Sélingué dam has reduced the water flooding the Inner Niger Delta; the Fomi Dam and planned irrigation schemes are expected to reduce it further.

UN Environment, Science Division
Government and regulators
Direction Nationale de l'Hydraulique et de l'Energie (Mali), studies of 1987 and 1995, as reported by Groupe URD

Rejected a role for the Sélingué and Markala dams in the fall in Niger flows; a further study was under way at the time of the URD report.

Groupe URD for the Agence Française de Développement
Communities and civil society
Populations of the Faguibine, as reported by Groupe URD

The Markala and Sélingué dams are often blamed by residents.

Groupe URD for the Agence Française de Développement
Researchers
Hamerlynck et al. (2016)

A phase shift around the year 2000 was probably a delayed consequence of the 1970s drought compounded by the collapse of societal controls on water use during civil conflict.

African Journal of Aquatic Science 41(1): 109-117 (Hamerlynck, Moulaye Zeine, Mutua, Mukhwana, Yéna)
Whether the lake has recovered since the efforts begun in 2009
Government and regulators
Tidiani Ascofare, Government of Mali restoration lead (2009), as quoted by UNEP

Farmed land around the lake would rise from 100 hectares in 2006 to more than 20,000 hectares in 2009.

UNEP - UN Environment Programme
International bodies
World Food Programme (14 December 2009)

The lake, "which three years ago was dry and surrounded by advancing desert, has again become an area of fertile land around a system of lakes offering water for pastoralists and a plentiful supply of fish".

World Food Programme (via ReliefWeb)
International bodies
UN Environment Foresight Brief (August 2017)

"there seems to be no recovery as can be seen in the 2016 image".

UN Environment, Science Division
Communities and civil society
ICRC (28 September 2021)

Describes a cracked lake bed; a farmer says the little water reaching the pond serves only to grow enough to survive.

International Committee of the Red Cross (ICRC Newsroom)
When the lake dried
International bodies
UN News (2008) and UNEP (2016)

Almost totally dry since the 1970s; droughts of the 1970s dried the lakes over seven years.

UN News
International bodies
NASA Earth Observatory (2008)

A drop in precipitation steadily dried the lake from the late 1980s.

NASA Earth Observatory
Researchers
Groupe URD (2020)

Complete drying of the lake in 1983; dry years of 1910, 1924, 1941, 1974 and since 1983.

Groupe URD for the Agence Française de Développement
International bodies
UN Environment Foresight Brief (2017)

The lake dried completely in 1914, 1924 and 1944 (citing Pérez, Fernández and Gatti, 2010).

UN Environment, Science Division

How it looked

What was shown, beside what was recorded.

Shown

  • The project presented as able to re-flood the lake's 600 square kilometres and bring "Improved livelihoods of about 200,000 mainly nomadic people living in the area", a lifeline for thousands of migratory water birds, more drinking water and water transport benefits.
    UNEP, story "Benefits galore if Mali's Lake Faguibine system were revived" · UNEP - UN Environment Programme
  • The project presented as one that "puts human well-being at it's pivot" and would restore ecosystem services for fishery, biodiversity, recession agriculture and eco-tourism.
    UNEP, project fact sheet · United Nations Environment Programme
  • The Faguibine rehabilitation presented as a follow-on from UNEP's rehabilitation of the Iraqi Marshlands.
    UN News and UNEP · UN News

Recorded

In nature's name

What was promised in nature's name, the money that moved, and what was measured.

Promised

  • “It aimed to re-flood the lake's 600 square kilometres in order to restore its vital ecosystems” — UNEP (28 June 2016) UNEP - UN Environment Programme
  • “Restore the ecosystems functioning of Lake Faguibine, which was decimated by prolonged drought compounded by poor catchment management” — UNEP, project fact sheet (stated objective) (2009) United Nations Environment Programme
  • “Improved livelihoods of about 200,000 mainly nomadic people living in the area” — UNEP (expected output) (28 June 2016) UNEP - UN Environment Programme

Money moved in nature's name

WhatKindAmountPeriod
Project budget stated in UNEP's project fact sheet (donor: Government of Norway), 2008–2015 (as stated on the fact sheet; other sources state larger project figures)
Government of Norway (donor); UNEP
United Nations Environment Programme
Budget$1m2008–2015
Expected cost of the Lake Faguibine rehabilitation reported by UN News (expected cost, with donors not named)
UNEP (estimate)
UN News
Budget> $12m2008
Lake Faguibine ecosystem restoration project launched in 2009 (as stated in UN Environment's 2017 brief; funders not stated)
UN Environment and other development partners
UN Environment, Science Division
Budget$15m2009
Additional funding from the West African Economic and Monetary Union (UEMOA) (as reported by UNEP in 2016; amount spent not stated)
West African Economic and Monetary Union (UEMOA)
UNEP - UN Environment Programme
Raised$5.23m2016
Reformulated project integrated into a broader UN-led programme (when fully funded)
UNEP and UN partners
UNEP - UN Environment Programme
Budget$40m2016

Benefit to nature: what was measured

Measured; no benefit found

The only look at the lake after the efforts begun in 2009 in the sources reviewed is UNEP's own reading of a 2016 satellite image ("there seems to be no recovery"), which is the operator's observation and not an independent measurement. Independent descriptions from 2019 to 2021 (Groupe URD for AFD; ICRC) report occasional flooding of the south-east of the lake and a cracked, dry lake bed, none of them a measurement of the project's effect. The 2009 statement of 20,000 hectares farmed comes from the government's restoration lead as quoted by UNEP and is not an independent measurement.

Flooded surface area of the system, 2010
about 90 km2
Lake in the 2016 image after efforts begun in 2009
no recovery seen
UNEP's reading of the image, August 2017 UN Environment, Science Division
Water in the lake, 2019 to 2021
occasional flooding of the south-east; cracked lake bed
Groupe URD (2019–2020 study) and ICRC (2021) Groupe URD for the Agence Française de Développement

Operation Suspended · Second-phase activities begun in 2011 were halted because of insecurity (UNEP, 2017); UNEP said in 2016 it was reviving the project in a reformulated form; no later status was found. UN Environment, Science Division

Findings on record

  • Own admission UN Environment, Foresight Brief (2017-08) · Saving Lake Faguibine - Foresight Brief, Figure 1 caption: “After rehabilitation efforts initiated in 2009, there seems to be no recovery as can be seen in the 2016 image.” UN Environment, Science Division
  • Own admission UNEP (2016-06-28) · Benefits galore if Mali's Lake Faguibine system were revived: “Implementation of the project has faced challenges mainly due to the difficult security situation since 2011.” UNEP - UN Environment Programme
  • Peer-reviewed study Hamerlynck et al., African Journal of Aquatic Science (2016-03-24) · Reflooding the Faguibine floodplain system, northern Mali: potential benefits and challenges: “the flooded surface area declined from about 1 000 km2 in the late 19th century to only some 90 km2 in 2010” African Journal of Aquatic Science 41(1): 109-117 (Hamerlynck, Moulaye Zeine, Mutua, Mukhwana, Yéna)

Who gained

Money that reached nature, beside money that stayed elsewhere.

Reached nature or the ground

Not published
No figure published.

Gained elsewhere

Not totalled
Currency: USD · Window: 2008–2016. All figures cover the same period. * Estimate built from cited figures.

Responses on record

  • UNEP (28 June 2016; August 2017): Said in 2016 that implementation had faced challenges mainly due to the security situation since 2011, that it was reviving the project with additional UEMOA funding of $5.23 million, and in 2017 that there seemed to be no recovery in the 2016 image. · UNEP - UN Environment Programme
  • Government of Mali (2016): According to UNEP, the government said the security situation could be greatly alleviated if the lake's ecosystem were restored and development projects implemented in the region. · UNEP - UN Environment Programme
  • Government of Norway: No statement of its own is recorded in the sources reviewed; named as donor in UNEP's fact sheet.
  • West African Economic and Monetary Union (UEMOA): No statement of its own is recorded in the sources reviewed; UNEP reports its additional funding of $5.23 million and its role in the 2011 second phase.

In court and with insurers

Every proceeding and every insurer decision on record.

Lawsuits and rulings

No court case on record. No court has ruled on this case.

Insurers

No insurer decision on record.

What nature saw

Outcomes measured on the ground, and nature's note.

Nature's report opens this page. Below: further outcomes measured on the ground.

Lake area when full, 1974
roughly 590 km2
NASA Earth Observatory, Landsat images of 1974 and 1978
Flooded surface area of the system, 2010
about 90 km2
Hamerlynck et al. (2016); about 1 000 km2 in the late 19th century
Lake after the efforts begun in 2009, 2016 image
no recovery seen
UN Environment Foresight Brief, August 2017: "there seems to be no recovery"
Land farmed around the lake, 2006 and 2009
100 ha and more than 20,000 ha
Statement by the government's restoration lead, 2009, as quoted by UNEP; not an independent measurement

What we don't know

Undisclosed, unproven, untried: recorded as data.

Nature

  • Disputed Why the lake dried and whether upstream water use contributed
  • Disputed Whether the lake has recovered since the efforts begun in 2009
  • Disputed When the lake dried

Accounts

Record

  • Disputed Disputed: the project's cost. UNEP's fact sheet gives USD 1 million with the Government of Norway as donor; UN News (2008) gave more than $12 million as the expected cost of the rehabilitation; UNEP's 2017 brief gave US $15 million; UNEP's 2016 story gave around $40 million for the reformulated project when fully funded. The sources do not reconcile the figures.
  • Disputed Disputed: when the lake dried. UN News and UNEP say almost totally dry since the 1970s; NASA says a decline from the late 1980s; Groupe URD gives complete drying in 1983.
  • None on record None on record: an evaluation of the project by UNEP or by an independent body; the sources reviewed contain none.
  • None on record None on record: how much of UEMOA's $5.23 million was spent, or the funders of the remaining part of the reformulated project's around $40 million.
  • None on record Not stated: whether the project launched in 2009 with US $15 million (UNEP, 2017) is the same operation as the first-phase restoration support project run by Mali's Office pour la Mise en Valeur du Système Faguibine with Norwegian funding from 2011.
  • Not measured Not measured: the flooded area of the system after 2010. The only post-2009 look at the lake in the sources reviewed is UNEP's reading of a 2016 image, and UNEP is the project's implementer.
  • Insufficient Insufficient: the cause of the drying. No study has evaluated the impact of upstream pumping on Niger flows (Groupe URD), and the national hydraulics directorate's studies of 1987 and 1995 rejected a role for the Sélingué and Markala dams while UNEP's 2017 brief states that the Sélingué dam has reduced flooding of the Inner Niger Delta.

Did the harm stop?

The sources reviewed do not report that the drying has stopped: UNEP's 2017 brief reports no recovery of the lake in its 2016 image, and the ICRC described cracked ground, buried houses and a closed school at the former lake in September 2021.

Who paid?

UNEP's fact sheet names the Government of Norway as donor with a budget of USD 1 million. UEMOA is recorded as providing additional funding of $5.23 million (2016). The other figures (more than $12 million, US $15 million, around $40 million when fully funded) are costs or project sizes stated without a breakdown by funder.

Sources

Voices on record: — Company or project✓ Government and regulators— Courts— Press and investigations✓ Communities and civil society✓ Researchers✓ International bodies

Government and regulators

  1. Drying of Lake Faguibine, Mali (Image of the Day)
    NASA Earth Observatory · 2008-08-10
  2. Rapport final: Evaluation finale de la 1ère phase du Projet d'Appui à la Restauration du Système Faguibine (PARF) (archived copy of 16 April 2021)
    Office pour la Mise en Valeur du Système Faguibine (OMVF), Ministère de l'Agriculture, Mali; hosted by the UNDP Evaluation Resource Centre · 2016-07

Researchers

  1. Reflooding the Faguibine floodplain system, northern Mali: potential benefits and challenges (abstract page)
    African Journal of Aquatic Science 41(1): 109-117 (Hamerlynck, Moulaye Zeine, Mutua, Mukhwana, Yéna) · 2016-03-24

International bodies

  1. Benefits galore if Mali's Lake Faguibine system were revived
    UNEP - UN Environment Programme · 2016-06-28
  2. Saving Lake Faguibine - Foresight Brief
    UN Environment, Science Division · 2017-08
  3. Mali: Restoring lake in desert, farmers keep hunger away
    World Food Programme (via ReliefWeb) · 2009-12-14

Connected cases

Related matters, and cases linked to this one through the same organisations, with the role each played in both.

Science and environment

Biomass, root-to-shoot ratio, carbon fraction
Biomass is the dry weight of living plants per hectare. The root-to-shoot ratio adds the weight of roots. The carbon fraction is the share of that weight that is carbon, about 47% in tropical forests.
Hectare (ha)
A unit of area equal to 10,000 square metres, about 2.5 acres. 100 hectares make one square kilometre.

Places and local terms

Pastoralists
People whose livelihoods depend on moving livestock between grazing lands.

Institutions

IUCN Red List
The International Union for Conservation of Nature and its global list assessing species' risk of extinction.

Carbon and conservation finance

Retired credit
A credit that has been used to make a climate claim and is permanently removed from circulation in the registry.

Law and courts

Trustees (natural resource)
Government agencies that act on behalf of the public to recover and spend damages for harm to natural resources.