ESPO oil pipeline rerouted away from the Baikal shore (2006)
- The record does not name which of my species, waters, soils or forests were harmed.
- Government and regulators Ministry of Natural Resources (November 2005): Objected that the route ran 800 m from the shore, while the previously approved route lay outside the catchment. Lenta.ru
- Government and regulators State ecological expertise commission (Kommersant): Negative conclusion on 24 January 2006; after enlargement by 34 experts it voted 58 for and 26 against, and Rostekhnadzor signed the positive conclusion on 3 March 2006. Kommersant Vlast
- Press and investigations RFE/RL: The state environmental watchdog had endorsed the plan to lay the pipe less than a kilometre from the shore shortly before the decision. RFE/RL
- Company or project Transneft (Vainshtok, 26 April 2006): Modelling put the maximum oil reaching the central ecological zone at no more than 170 kg; the solutions fully ruled out oil entering the lake. Kremlin
- Government and regulators President Putin (26 April 2006): Even a tiny share of danger of polluting Baikal had to be excluded, not minimised. Kremlin
- Communities and civil society Greenpeace Russia, IFAW Russia and WWF Russia: Prepared a study of the pipeline's harm for Transneft's potential lenders; its content is not on record. Lenta.ru
On 26 April 2006 President Vladimir Putin ordered Transneft to move the East Siberia–Pacific Ocean (ESPO) oil pipeline north of the Lake Baikal catchment, after a route about 800 m from the northern shore had received a positive state ecological expertise conclusion. Putin later put the extra cost at an additional $1 billion.
Statement by President Putin on 25 October 2006; the first-stage cost is reported in different units and amounts by different sources.
Status As of 2008 (latest source): the first-stage route Taishet–Ust-Kut–Lensk–Aldan–Skovorodino was approved by the Prime Minister in February 2008, with the first-stage cost reported at $11.2bn.
What happened
The pipeline route originally approved ran along the northern shore of Lake Baikal, about 800 m from the water (Kremlin transcript; Lenta.ru). On 11 November 2005 the Ministry of Natural Resources objected that the route ran 800 m from the shore, while the previously approved route lay outside the catchment. The state ecological expertise commission issued a negative conclusion on 24 January 2006; in early March the commission was enlarged by 34 experts and voted 58 for and 26 against, and on 3 March 2006 Rostekhnadzor head Konstantin Pulikovsky signed the positive conclusion (Kommersant). On 9 March 2006 the Supreme Court upheld the government's resolution of 31 December 2004 on the pipeline.
At a meeting in Tomsk on 26 April 2006, Transneft head Semyon Vainshtok said the Baikal water-protection zone was 500 metres and the pipeline could be moved a further 300 metres, to 800 metres from the lake. He said modelling put the maximum oil reaching the central ecological zone at no more than 170 kilograms "if something improbable happens", and that Transneft's solutions fully ruled out oil entering the lake. Russian Academy of Sciences vice-president Nikolai Laverov proposed routing the pipeline along the watersheds, and Putin asked whether a northern route was technically possible. Putin then ordered that the pipeline pass north of the Baikal catchment line. Construction started on 28 April 2006.
On 25 October 2006, in a televised Hot Line, Putin said the change in route would cost an additional $1 billion. On the day of the decision Vainshtok had said he was unable to say how many kilometres the pipeline would lengthen or how much more it would cost. Kommersant reported in 2008 that the first-stage cost rose from $6.65 billion to $11.2 billion and the route became about 500 km longer, without attributing the whole increase to the reroute.
The final first-stage route ran Taishet–Ust-Kut–Lensk–Aldan–Skovorodino and was approved by Prime Minister Viktor Zubkov in February 2008. Transneft set up a subsidiary, the ESPO Project Management Centre, in Angarsk; Krasnodarstroitransgaz and China Petroleum Pipeline Bureau also worked on the project. Kommersant (2008) reported a hepatitis A outbreak among 24 workers on the final route, an emergency regime in the Neryungri district and a criminal case.
- 2005Ministry of Natural Resources objected to the route 800 m from the shore (11 Nov)
- 2006Negative expertise conclusion (24 Jan); enlarged commission voted 58–26; positive conclusion signed (3 Mar); Supreme Court upheld the 2004 government resolution (9 Mar); Putin ordered the reroute at Tomsk (26 Apr); construction started (28 Apr); Putin stated the extra cost (25 Oct)
- 2008Route approved by Prime Minister Zubkov (February); Kommersant reported first-stage cost of $11.2bn
What was said
“The Baikal water-protection zone is now 500 metres. We have moved as far as possible, another 300 metres. So we can be 800 metres from Baikal”
“Our solutions fully rule out oil entering Lake Baikal”
“The pipeline system… must pass beyond the catchment line, north of Lake Baikal's catchment line”
“If there is even a tiny share… of danger of polluting Baikal, then we… must do everything not to minimise that danger but to exclude it”
“the change in the pipeline route will cost us an additional $1 billion… the oil companies will thus be able to save on auxiliary routes. Overall, the costs are not so huge, and we will preserve Lake Baikal”
“I cannot say by how many kilometers the pipeline will be lengthened and how much more it will cost”
“We were totally convinced that the route we proposed, which was much shorter, was totally safe.”
“Transneft's reaction is extremely positive, as this finally means a line has been drawn under the issue.”
Where accounts differ
Each party's account, side by side, with its source. The record does not settle these points; it shows them.
Objected that the route ran 800 m from the shore, while the previously approved route lay outside the catchment.
Lenta.ruNegative conclusion on 24 January 2006; after enlargement by 34 experts it voted 58 for and 26 against, and Rostekhnadzor signed the positive conclusion on 3 March 2006.
Kommersant VlastThe state environmental watchdog had endorsed the plan to lay the pipe less than a kilometre from the shore shortly before the decision.
RFE/RLModelling put the maximum oil reaching the central ecological zone at no more than 170 kg; the solutions fully ruled out oil entering the lake.
KremlinEven a tiny share of danger of polluting Baikal had to be excluded, not minimised.
KremlinPrepared a study of the pipeline's harm for Transneft's potential lenders; its content is not on record.
Lenta.ruFirst stage, in second-quarter 2004 prices: 6,650 million rubles.
Kremlin$6.6 billion for the first stage and $11.5 billion in total.
Lenta.ruFirst-stage cost rose from $6.65 billion to $11.2 billion and the route became about 500 km longer.
KommersantThe change in route would cost an additional $1 billion.
KremlinHow it looked
Shown
- Transneft told the meeting that modelling put the maximum oil reaching the central ecological zone at no more than 170 kilograms and that its solutions fully ruled out oil entering the lake.Transneft (Semyon Vainshtok), 26 April 2006 · Kremlin
- The extra cost was "not so huge" and Lake Baikal would be preserved.President Putin, 25 October 2006 · Kremlin
- Rail transport near Baikal was riskier than the pipeline.Russian Railways (Vladimir Yakunin), Tomsk meeting · Kremlin
Recorded
- PortNews reported the 25 October 2006 statement under the headline "Pacific oil pipeline project to cost extra $1 billion – Putin".
- The decision was taken by the President at a regional meeting in Tomsk on 26 April 2006; the route was later approved by the Prime Minister in February 2008.
- The state ecological expertise moved from a negative conclusion (24 January 2006) to a positive one (3 March 2006) after the commission was enlarged by 34 experts; Kommersant reported that four votes were missing to block approval.
- Greenpeace Russia, IFAW Russia and WWF Russia prepared a report on the pipeline's harm for Transneft's potential lenders.
- The day before the decision, Transneft said it had secured a construction loan from Sberbank; no amount was given.
- The state environmental watchdog had endorsed the plan to lay the pipe less than a kilometre from the lake shore shortly before the decision (RFE/RL).
Who gained
Reached nature or the ground
Gained elsewhere
Responses on record
- Transneft (26 April 2006): Vice-president Sergey Grigoryev said Transneft's reaction was extremely positive, as a line had finally been drawn under the issue; Vainshtok said Transneft had been totally convinced its shorter route was safe. · Oil & Gas Journal
- Ministry of Natural Resources (2005): Press secretary Rinat Gizatulin said in 2005 that the ministry would not obstruct the fastest approval. · Lenta.ru
- Russian Railways (26 April 2006): Vladimir Yakunin argued at the Tomsk meeting that rail transport near Baikal is riskier than the pipeline. · Kremlin
In court and with insurers
Lawsuits and rulings
- 2006–2006Claimant wonState ecological expertise of the ESPO feasibility studyRostekhnadzor, state ecological expertise commission · Regulatory · Transneft (project applicant) → Rostekhnadzor expertise commission
Negative conclusion on 24 January 2006; after the commission was enlarged by 34 experts it voted 58 for and 26 against, and the positive conclusion was signed on 3 March 2006. Kommersant Vlast
- 2006Defendant wonSupreme Court review of the government resolution of 31 December 2004 authorising ESPOSupreme Court of the Russian Federation · Administrative · Applicant not named → Government of the Russian Federation
On 9 March 2006 the Supreme Court found the government resolution lawful. Kommersant Vlast
Insurers
What nature saw
Nature's report opens this page. Below: further outcomes measured on the ground.
What we don't know
Nature
- Not measured Harm to nature: The record holds no measurement of harm to nature.
- Disputed State ecological expertise of the pipeline route
- Disputed Risk of oil reaching Lake Baikal
Record
- Not disclosed Not disclosed: the share of the first-stage cost increase attributable to the reroute. The President stated an additional $1 billion; Kommersant (2008) reported the first-stage cost rising from $6.65 billion to $11.2 billion without attributing all of it to the reroute.
- Disputed Figures differ: Vainshtok gave the first-stage cost at Tomsk as 6,650 million rubles in second-quarter 2004 prices (Kremlin transcript); press reports gave $6.6 billion for the first stage and $11.5 billion in total (Lenta.ru).
- Disputed Figures differ: the distance the route was moved is given as more than 40 km (Oil & Gas Journal, RFE/RL), "maybe 200 km north" (Putin, via Lenta.ru) and about 500 km longer in total (Kommersant, 2008).
- Not measured Not measured: harm to the Baikal catchment from the pipeline; the route was not built there. The 170 kg figure is Transneft's own modelling estimate.
Did the harm stop?
Putin ordered the pipeline moved north of the Baikal catchment on 26 April 2006, and construction started on 28 April 2006; the route was approved in February 2008.
Who paid?
Transneft, a state-owned company, carried the project cost; the President stated the reroute would cost an additional $1 billion.
Sources
Government and regulators
- Transcript of the meeting on the Siberian Federal District, TomskKremlin · 2006-04-26
- Transcript of the Hot Line with President of Russia Vladimir PutinKremlin · 2006-10-25
Press and investigations
- For protection of the surrounding pipeKommersant Vlast · 2006-04-10
- Empty pipeKommersant · 2008-03-24
- The eastern pipeline will run near BaikalLenta.ru · 2005-11-11
- Putin ordered the pipeline moved away from BaikalLenta.ru · 2006-04-26
- Putin Reroutes Pipeline Away From BaikalRFE/RL · 2006-04-26
- Putin changes Siberia-Pacific oil line routeOil & Gas Journal · 2006-04-26
- Pacific oil pipeline project to cost extra $1 billion – PutinPortNews · 2006-10-25
Connected cases
- Baikal Natural Territory: expertise exemptions and clear-cutting rules Russia · 2020–2026 Related matter
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Sets the list of objects under Article 25.1(3); Deputy Prime Minister statements
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Criticised the 2020 law (Greenpeace Russia)
- Russian Railways (RZD) (Company) — here: Argued at Tomsk that rail transport near Baikal is riskier than the pipeline; there: Operator of the BAM and Trans-Siberian railways; beneficiary of the Article 25.1 regime
- Baikalsk Pulp and Paper Mill: closure and waste clean-up Russia · 1966–2026 Related matter
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Decree No. 1; funded wages and clean-up; named contractors
- Supreme Court of the Russian Federation (Court) — here: Upheld the 2004 government resolution on 9 March 2006; there: Dismissed challenges to Decree No. 1
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Co-applicant against Decree No. 1 (Greenpeace Russia)
- Baikal omul industrial fishing ban (from 2017) Russia · 2016–2026 Related matter
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Funded releases, hatchery and research vessel
- Supreme Court of the Russian Federation (Court) — here: Upheld the 2004 government resolution on 9 March 2006; there: Appeals Board invalidated the amateur net ban on 10 December 2024
- Sochi 2014 Winter Olympics: environmental pledges and the Mzymta valley Russia · 2007–2018
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Host government; Putin and Kozak statements
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Resigned as Olympstroy adviser in 2010 (Greenpeace Russia)
- WWF Russia (NGO) — here: Co-authored a report on the pipeline's harm; there: Resigned as Olympstroy adviser in 2010
- Russian Railways (RZD) (Company) — here: Argued at Tomsk that rail transport near Baikal is riskier than the pipeline; there: Built the Adler–Krasnaya Polyana link; operated the Akhshtyr dump; paid fines
- Arctic Sunrise seizure at the Prirazlomnaya platform: ITLOS bond, PCA arbitration, 2019 settlement and ECtHR judgment Russia · 2012–2023
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Respondent; did not appear before ITLOS or the PCA tribunal; settled in 2019
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Greenpeace Russia: contested the platform's spill-response plan
- WWF Russia (NGO) — here: Co-authored a report on the pipeline's harm; there: Commented in 2013 on the lack of a spill-response plan for ice conditions
- Russia's forest-fire control zones and federal fire-service funding Russia · 2015–2026
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Reserve-fund Order No. 2740-r (2026); Decree No. 382 issued by the President
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Greenpeace Russia: commentary and satellite-based estimates
- WWF Russia (NGO) — here: Co-authored a report on the pipeline's harm; there: Commentary on zones and funding
- Avacha Bay marine die-off, Kamchatka, autumn 2020 Russia · 2020–2022
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: NGO; Greenpeace Russia satellite analysis
- WWF Russia (NGO) — here: Co-authored a report on the pipeline's harm; there: NGO commenting on data publication
- Hardwood logging in the Russian Far East and exports to China Russia · 2001–2023
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Officials' statements 2020 and 2023
- WWF Russia (NGO) — here: Co-authored a report on the pipeline's harm; there: Author of the 2013 report on illegal logging in the Russian Far East
- Khimki forest and the M11 Moscow–St Petersburg toll motorway (km 15–58) Russia · 2007–2025
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Land-transfer order; Medvedev and Ivanov statements
- Supreme Court of the Russian Federation (Court) — here: Upheld the 2004 government resolution on 9 March 2006; there: Ruled the land transfer lawful on 1 March 2010
- Lukoil-Komi oil spills in the Usinsk area and the Kolva River, 2011–2023, damage claims and payments Russia · 2011–2023
- Rostekhnadzor (Federal Service for Environmental, Technological and Nuclear Supervision) (Public authority) — here: Signed the positive state ecological expertise conclusion on 3 March 2006; there: Industrial safety regulator; found the line did not meet requirements
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Documented chronic spills; third party in the 2012 administrative case
- Nornickel Sulphur Programme: SO2 targets, spending and measured emissions at Norilsk and Kola Russia · 2015–2026
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Resolution No. 353 of 12 March 2022; emissions-quota experiment postponed
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Ranked SO2 hotspots using NASA data (August 2019)
- Russia labels WWF Russia a foreign agent, then an undesirable organisation Russia · 2023
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Declared undesirable on 19 May 2023
- WWF Russia (NGO) — here: Co-authored a report on the pipeline's harm; there: Conservation organisation designated a foreign agent, then an undesirable organisation
- Siberian wildfire season of 2019: Krasnoyarsk, Irkutsk and Yakutia Russia · 2019
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Prime Minister ordered arson checks (1 August 2019)
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Greenpeace Russia: funding and damage-accounting commentary
- Talnakh Concentrator tailings facility: wastewater pumped onto the tundra, 2017–2020 Russia · 2017–2024
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Took samples at the discharge on 25 June 2020
- WWF Russia (NGO) — here: Co-authored a report on the pipeline's harm; there: Reported discharges since 2017 from satellite imagery
- Usinsk pipeline spill (Komi, 1994) and the World Bank and EBRD emergency loans Russia · 1994–2004
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Borrower of both loans; on-lent them to Komineft
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: One of the NGOs consulted in 1995 (World Bank completion report)
- Alliance to End Plastic Waste and Renew Oceans (Ganges) India · 2019–2026
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Its Unearthed unit published the 2024 comparison
- Brent Spar decommissioning controversy (North Sea) United Kingdom · 1995–2019
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Campaigner in the Brent Spar controversy
- Coca-Cola plastic pledges and brand audits United States · 2018
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Analyst of the alliance's results
- Corporate suits against Greenpeace (TotalEnergies, Shell, Resolute) France, United Kingdom, United States · 2019–2024
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Defendant in all three suits
- Cosmos 1408 anti-satellite test (Russia) Russia · 2021
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Conducted the test
- Daldykan River turns red near Norilsk, September 2016 Russia · 2016
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Greenpeace Russia commented on the incident
- EDF spying on Greenpeace (France) France · 2011–2013
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Organisation placed under surveillance; awarded damages at first instance
- Energy Transfer v Greenpeace (Dakota Access) United States · 2017–2026
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Defendant in the federal suit
- EU bans three neonicotinoid pesticides outdoors in 2018; Turkey follows in part European Union · 2018
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: campaigner and reporter on exports
- EU seal-product ban's Inuit exemption found ineffective Canada · 2014
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Campaigner; apology issuer (unconfirmed)
- Greenpeace leaves the Forest Stewardship Council in 2018 Global · 2018
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Organisation that ended its FSC membership
- Greenpeace says fisheries scientist Ray Hilborn got $3.56m from seafood groups United States · 2003–2016
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: complainant; reported the funding figures
- Hess agreed to buy at least US$750 million of Guyana forest credits Guyana · 2011–2032
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Campaign group that criticised the plan
- Indonesia's forest moratorium: ministry cited 38% less clearing, Greenpeace disputed it Indonesia · 2011–2019
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: critic; published satellite analysis
- Kerch Strait storm, November 2007: Volgoneft 139 fuel-oil spill and sulphur-ship sinkings Russia · 2007–2018
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Government claimants; military clean-up reported
- McKinsey advice to COP28 presidency and fossil clients United Arab Emirates · 2011–2025
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Author of the 2011 report on McKinsey's cost curves
- Norilsk diesel spill Russia · 2020–2023
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Declared federal emergency; federal budget received the award
- Plastic waste imports into Türkiye (Adana) Türkiye · 2016–2026
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Reported UK plastic at Adana dumping sites (2021)
- Raja Ampat nickel licences revoked Indonesia · 2025
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Campaign organisation; reported more than 500 hectares destroyed
- Resolute Forest Products v Greenpeace Canada · 2012–2024
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Defendant in the US case; campaigner
- Russia declares WWF and Greenpeace 'undesirable' organisations Russia · 2023
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Declared undesirable and closed in Russia
- Russia's 1 January 2022 ban on exports of unprocessed softwood and valuable hardwood logs Russia · 2020–2025
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Issued the instruction, duties and quotas
- Russia's national carbon-unit system under Federal Law 296-FZ Russia · 2021–2026
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Adopted Decree No. 234 of 2026
- Russian forest-climate projects: RUSAL fire-protection units and Sakhalin larch planting Russia · 2019–2026
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Federal Law 492-FZ and reserve-account rules
- Russian Joint Implementation credits under the Kyoto Protocol, 2009–2012 Russia · 2009–2015
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Approved projects through the Designated Focal Point
- Sakhalin carbon-neutrality experiment under Federal Law 34-FZ Russia · 2022–2028
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Set the payment rate; federal law 34-FZ
- Sakhalin-2 and Sakhalin-1 in 2022: transfer decrees, the ecological-audit deduction clause and write-downs Russia · 2022–2026
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Decree No. 416 and the orders on the stake sale
- Sakhalin-2: 2006 approval revocation, Gazprom stake purchase, 2009 damage-claim settlement and lender exits Russia · 2005–2009
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: President Putin present at the December 2006 protocol
- Shell and Greenpeace settle Penguins FPSO case; Greenpeace pays RNLI £300,000 United Kingdom · 2023–2024
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Defendant; paid the RNLI and accepted exclusion zones
- Soviet whaling catches and the reports to the IWC, 1948–1979 Russia · 1948–1994
- Government of Russia (Government) — here: President ordered the reroute; Prime Minister approved the route; there: Supplied original catch data to the IWC Scientific Committee in 1994
- Tukolon reserve sanitary logging conviction in Irkutsk Oblast Russia · 2018–2024
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Prompted the Rosleskhoz check
- Turmeric, neem, basmati, Nap Hal patent revocations India · 2004–2022
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Declared victory on the Nap Hal wheat revocation
- UK packaging recycling notes (PRN) system and fraud cases United Kingdom · 2009–2025
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: NGO; found UK plastic at sites in Adana
- Yakutia wildfire season of 2021: burned area and emissions Russia · 2021
- Greenpeace (NGO) — here: Co-authored a report on the pipeline's harm (Greenpeace Russia); there: Greenpeace Russia: satellite-based area and commentary