Greater Tortue Ahmeyim LNG project, the deep-water coral reef and BP's reef mitigation
- The NCEA described these corals as extremely vulnerable to any physical disturbance of my seabed, and cited four scientific cruises (Ramos et al., 2017) that described live coral in the area. Netherlands Commission for Environmental Assessment (NCEA)
- My zone likely holds "the only black corals of the slope", according to the NCEA, and had been identified as a candidate marine protected area. Netherlands Commission for Environmental Assessment (NCEA)
- At least 150 bottom-dwelling species live on my reef, according to scientists cited by Mongabay. Mongabay (E. Toto)
- Between 19 February and 12 March 2025, gas bubbles leaked from one of four wells before a sealing device was installed. BP assessed the impact as expected to be negligible. Le360 Afrique / AFP
- Government and regulators Senegal's fisheries ministry, as reported by Le Soleil: The reef is part of the GTA gas project's mitigation measures. Le Soleil (Cheikh Gora Diop)
- Company or project BP communiqué, as reported by Ndarinfo: The reef falls under the GTA social investment programme. Ndarinfo
- Company or project BP: The project was approved in 2018 by both governments and regulators following a thorough review process. Mongabay (E. Toto)
- International bodies NCEA advisory (6 December 2018): The ESIA's environmental information is incomplete and/or has not been sufficiently used; baseline photographs show reef-building Lophelia, not solitary or fossil corals. Netherlands Commission for Environmental Assessment (NCEA)
- Researchers Sandra Kloff, marine biologist and NCEA panel member: The biodiversity analysis was poorly done, with deep-sea species misidentified and currents not identified. Mongabay (E. Toto)
- Company or project BP: Low-rate subsea gas bubbles; the impact was expected to be negligible. Reuters via CNBC Africa
- Government and regulators Mauritania's environment ministry: Conducting in-depth investigations to prevent any environmental impact. Reuters via CNBC Africa
- Communities and civil society Greenpeace Africa (Dr Aliou Ba): BP showed utter disregard for marine life and coastal communities; BP should publish independent data on the leak. Greenpeace Africa
- Communities and civil society A Saint-Louis artisanal fishers' association: Feared insidious pollution with possibly irreversible effects. Le360 Afrique / AFP
BP operates the Greater Tortue Ahmeyim LNG project on the Mauritania–Senegal maritime border, where the Netherlands Commission for Environmental Assessment found in 2018 that the environmental assessment was incomplete and that the seabed holds live reef-building Lophelia corals. A gas leak at one of four wells was found in February 2025, and a 3.2 billion FCFA artificial reef was announced as mitigation by Senegal's fisheries ministry.
Described by Senegal's fisheries ministry as part of the project's mitigation measures. Mongabay (2023) gave the Phase 1 cost as USD 4.5 billion.
Status As of December 2025: the artificial reef was immersed off Saint-Louis (BP, 17 December 2025); no revised ESIA is on record, and the 2025 leak was sealed on 12 March 2025.
- BP, Kosmos Energy, Petrosen and SMH — Project partners; Kosmos and partners begin recognising revenue at the first cargo lifting Offshore Technology
- Reef-building Lophelia coral habitat along the pipeline route — Live corals identified by the NCEA's reading of the ESIA baseline photographs Netherlands Commission for Environmental Assessment (NCEA)
- Bottom-dwelling species on the reef — At least 150 species, per scientists cited by Mongabay Mongabay (E. Toto)
What happened
The Greater Tortue Ahmeyim (GTA) project is an offshore LNG development operated by BP with Kosmos Energy, Petrosen (Senegal) and SMH (Mauritania) on the Mauritania–Senegal maritime border. Mongabay gave the Phase 1 cost as USD 4.5 billion and the capacity as 2.5 million tonnes of LNG a year for about 20 years; Reuters (2025) gave 2.3 million tonnes a year. First gas reached the floating production unit on 31 December 2024 (Offshore Technology).
A 4,400-page environmental and social impact assessment (ESIA) was submitted to both governments in 2018. On 1 September 2018, at the request of Senegal's Direction de l'Environnement et des Établissements Classés (DEEC), the Netherlands Commission for Environmental Assessment (NCEA) began a review. Ten marine scientists sent an open letter on 12 November 2018. The NCEA's advisory of 6 December 2018 stated that the ESIA's environmental information is incomplete and/or has not been sufficiently used, and recommended requiring the developers to update the ESIA before deciding on authorisation of the project. Days later both governments approved drilling without changes to the ESIA (Mongabay).
On biodiversity the NCEA stated (translated from French) that the pipeline crosses habitats critical for fisheries resources and that the floating production unit also sits in this vulnerable environment. It described the habitat as made up of reef-building corals (Lophelia), extremely vulnerable to any physical disturbance of the seabed, and stated that seabed photographs from the ESIA baseline had been misinterpreted: they show reef-building Lophelia, not solitary or fossil corals as the ESIA states. It cited four scientific cruises by Ramos et al. (2017) that described live coral in the area, found the micro-contaminant baseline methods obsolete and not in line with OSPAR criteria, and stated that the zone likely holds "the only black corals of the slope" and had been identified as a candidate marine protected area. It also recommended a study of alternatives to discharging production water at sea, notably reinjection.
Senegal's national technical validation committee validated the ESIA on condition that its recommendations were taken into account. According to Mongabay (February 2023), BP agreed to review the ESIA after four years of petitioning by scientists; hazard modelling was awaiting funding, the original ESIA remained the official document, and the scientists' recommendations (reinjecting produced water, covering the pipeline with rock instead of trenching, a PAH baseline in Senegal) had not been adopted at the time of publication.
A gas leak was found on 19 February 2025 at one of four wells. BP and Mauritania's environment ministry announced it on 5 March 2025; BP said it had discovered low-rate subsea gas bubbles and expected the impact to be negligible. A sealing device was installed on 12 March 2025, after which the bubbles stopped visually, and BP said further tests, monitoring and visual inspections would continue. Greenpeace Africa asked BP to publish independent data on the leak. Separately, an artificial reef of 3.2 billion FCFA, funded by BP, Kosmos Energy and Petrosen, was shown at the Port of Dakar on 21–22 October 2025; BP announced on 17 December 2025 that it had been immersed about 4 km off Saint-Louis.
- 20184,400-page ESIA submitted to both governments; NCEA review starts 1 Sep at Senegal's DEEC request; ten marine scientists send an open letter 12 Nov; NCEA advisory 6 Dec; drilling approved days later without changes to the ESIA
- 2023February: BP agrees to review the ESIA after four years of petitioning by scientists; original ESIA still the official document
- 202431 Dec: first gas to the floating production unit
- 202519 Feb: gas leak found at one of four wells; 5 Mar: BP and Mauritania's environment ministry announce it; 12 Mar: sealing device installed; 21–22 Oct: reef modules shown at the Port of Dakar; 17 Dec: BP announces the reef is immersed
What was said
“are incomplete and/or have not been sufficiently used”
“before deciding on authorisation”
“the only black corals of the slope”
“We aim to contribute towards the conservation of the marine ecosystem in Mauritania and Senegal”
“we discovered low-rate subsea gas bubbles”
“conducting in-depth investigations to effectively manage the situation and prevent any environmental impact.”
“incidents of this kind often occur at the start of production”
“BP is once again demonstrating its utter disregard for marine life and coastal communities”
“these reefs will boost regeneration of fish stocks and preserve marine biodiversity”
Where accounts differ
Each party's account, side by side, with its source. The record does not settle these points; it shows them.
2.5 million tonnes of LNG a year for about 20 years.
Mongabay (E. Toto)The reef is part of the GTA gas project's mitigation measures.
Le Soleil (Cheikh Gora Diop)The reef falls under the GTA social investment programme.
NdarinfoThe project was approved in 2018 by both governments and regulators following a thorough review process.
Mongabay (E. Toto)The ESIA's environmental information is incomplete and/or has not been sufficiently used; baseline photographs show reef-building Lophelia, not solitary or fossil corals.
Netherlands Commission for Environmental Assessment (NCEA)The biodiversity analysis was poorly done, with deep-sea species misidentified and currents not identified.
Mongabay (E. Toto)Low-rate subsea gas bubbles; the impact was expected to be negligible.
Reuters via CNBC AfricaConducting in-depth investigations to prevent any environmental impact.
Reuters via CNBC AfricaBP showed utter disregard for marine life and coastal communities; BP should publish independent data on the leak.
Greenpeace AfricaFeared insidious pollution with possibly irreversible effects.
Le360 Afrique / AFPNames Tanya van Gool as chair.
Netherlands Commission for Environmental Assessment (NCEA)Lists Dano Roelvink as chair and van Gool as technical secretary.
Netherlands Commission for Environmental Assessment (NCEA)How it looked
Shown
- The project "was approved in 2018 by the governments and regulators of both Mauritania and Senegal, following a thorough review process".BP, quoted by Mongabay, February 2023 · Mongabay (E. Toto)
- The artificial reef is part of the GTA project's mitigation measures.Senegal's fisheries ministry, as reported by Le Soleil, October 2025 · Le Soleil (Cheikh Gora Diop)
- The artificial reef falls under the GTA "social investment" programme, funded to the tune of several million dollars; ten modular sets of cubes and pyramids designed for 99 years.BP communiqué, as reported by Ndarinfo, December 2025 · Ndarinfo
- The impact of the 2025 leak was expected to be negligible.BP, as reported by Reuters via CNBC Africa, March 2025 · Reuters via CNBC Africa
Recorded
- The NCEA's reading of the ESIA baseline photographs shows live reef-building Lophelia along the future pipeline zone; the ESIA had described them as solitary or fossil corals.
- As of February 2023 the original ESIA remained the official document and hazard modelling was awaiting funding.
- A leak found on 19 February 2025 at one of four wells; bubbles stopped visually after sealing on 12 March 2025; BP said further tests, monitoring and visual inspections would continue.
- Greenpeace Africa asked BP to publish independent data on the leak.
- The exact amount of the GTA social investment programme is not given in BP's communiqué.
Who gained
Reached nature or the ground
Gained elsewhere
Responses on record
- bp (February 2023; March 2025): Marie Diop Toguyeni said BP aims to contribute to conservation of the marine ecosystem in Mauritania and Senegal and that the project was approved in 2018 by both governments and regulators following a thorough review process. On the 2025 leak BP said it discovered low-rate subsea gas bubbles, expected the impact to be negligible and had a plan to stop the bubbles. · Reuters via CNBC Africa
- mauritania-gov (5 March 2025): The environment ministry said it was conducting in-depth investigations to manage the situation and prevent any environmental impact; an oil ministry adviser said incidents of this kind often occur at the start of production. · Reuters via CNBC Africa
- senegal-gov (October 2025): Fisheries minister Dr Fatou Diouf said the artificial reefs will boost regeneration of fish stocks and preserve marine biodiversity. · Le Soleil (Cheikh Gora Diop)
In court and with insurers
Lawsuits and rulings
Insurers
What nature saw
Nature's report opens this page. Below: further outcomes measured on the ground.
What we don't know
Nature
Money
- None on record Artificial reef off Saint-Louis (BP, Kosmos Energy, Petrosen) — 3.2 billion FCFA (Le Soleil). BP's communiqué says the programme is funded to the tune of several million dollars and gives no exact amount.
Court
- None on record No court case on record.
Record
- Not measured Not measured: the volume of gas released in the February–March 2025 leak; no independent measurement is on record, and BP's own assessment is that the impact was expected to be negligible.
- Not disclosed Not disclosed: the exact amount of BP's GTA social investment programme; the communiqué says several million dollars.
- Insufficient Insufficient: no revised ESIA had been published as of February 2023, and hazard modelling was awaiting funding.
- None on record None on record: a biodiversity fund or offset for the cold-water reef itself; Mongabay (2023) mentions none.
- None on record None on record: a court case or regulatory penalty.
- Disputed Figures differ: Mongabay (2023) gives a Phase 1 cost of USD 4.5 billion, Offshore Technology gives USD 4.8 billion; Mongabay gives the reef system's length as 600 km, other press reports give 580 km.
- Unclear Unclear: whether a revised ESIA or new hazard modelling was published between 2023 and 2026, and the status of Phase 2.
Did the harm stop?
The leak was visually stopped on 12 March 2025 after a sealing device was installed; BP said monitoring and inspections would continue. The NCEA's 2018 findings on the coral habitat are not recorded as resolved.
Who paid?
The coral habitat and its species along the pipeline route; no biodiversity offset for the reef is on record. BP, Kosmos Energy and Petrosen funded the 3.2 billion FCFA artificial reef off Saint-Louis.
Sources
Press and investigations
- Win for science as BP pressured into cleaning up offshore gas plansMongabay (E. Toto) · 2023-02-09
- BP and Mauritania say leak detected at gas project off West AfricaReuters via CNBC Africa · 2025-03-05
- Gas leak off Senegal and Mauritania has ended, BP saysLe360 Afrique / AFP · 2025-03-14
- 3.2 billion FCFA to bring Saint-Louis's fish back to lifeLe Soleil (Cheikh Gora Diop) · 2025-10-22
- BP announces it has immersed an artificial reef off Saint-LouisNdarinfo · 2025-12-17
- First LNG at Greater Tortue Ahmeyim projectOffshore Technology · 2025-02-10
Communities and civil society
- GTA project gas leak: BP oil company in the dockGreenpeace Africa · 2025-03-06
International bodies
- Examen de l'EIES du Projet de production de gaz – Grand Tortue Ahmeyim – Phase 1 – Sénégal (NCEA advisory, ref. 7300)Netherlands Commission for Environmental Assessment (NCEA) · 2018-12-06
- NCEA project 7300 pageNetherlands Commission for Environmental Assessment (NCEA) · 2026-10-19
Connected cases
- Mauritania fishmeal industry, sardinella stocks and foreign fishing agreements Mauritania · 2008–2026
- Government of Mauritania (Government) — here: Approved the ESIA in 2018; environment and oil ministries commented on the leak; there: Fisheries ministry; licensing and regulation of fishmeal plants
- Greenpeace Africa (NGO) — here: Asked BP to publish independent data on the 2025 leak; there: NGO; intercepted a fish-oil tanker in 2021
- Bolivian carbon scheme claimed 55 million tonnes; review found at most 5.8 million Bolivia · 1997–2010
- BP (Company) — here: Operator of the GTA project; there: company; partner in the scheme; donor to TNC
- BP “Beyond Petroleum” campaign and carbon footprint calculator United Kingdom · 2000–2025
- BP (Company) — here: Operator of the GTA project; there: Launched the “Beyond Petroleum” brand and the carbon footprint calculator
- BP acquires majority stake in Finite Carbon, a US forest carbon developer United States · 2020
- BP (Company) — here: Operator of the GTA project; there: acquirer of a majority stake in Finite Carbon
- BP and Eni do not declare gas flared at Iraq's Rumaila field, citing non-operator status Iraq · 2021–2022
- BP (Company) — here: Operator of the GTA project; there: Non-operator; does not declare Rumaila gas flaring
- BP Deepwater Horizon: the spill, the court cases and the recovery claims United States · 2010–2031
- BP (Company) — here: Operator of the GTA project; there: Well operator and lease holder; pleaded guilty; paid $20.8bn civil settlement; self-insured
- BP's Gulf spill used Corexit; Nalco board had ex-BP and Exxon executives United States · date not stated
- BP (Company) — here: Operator of the GTA project; there: Company responsible for the spill response and dispersant choice
- COP28 decision promoted carbon capture and left room for transition fuels United Arab Emirates · 2023
- BP (Company) — here: Operator of the GTA project; there: Member of the Global CCS Institute; three of six executives worked or work here
- Danone, Unilever and BP scaled back sustainability goals between 2021 and 2025 Global · 2021–2025
- BP (Company) — here: Operator of the GTA project; there: Oil company that cut low-carbon investment in 2025
- DR Congo oil blocks auction after forest deal Democratic Republic of the Congo · 2022–2026
- Greenpeace Africa (NGO) — here: Asked BP to publish independent data on the 2025 leak; there: NGO reporting on overlap with protected areas
- Ghana committee finds Kosmos negligent over 2010 Jubilee field spills Ghana · 2010–2011
- Kosmos Energy (Company) — here: Partner; co-funder of the artificial reef; there: company found negligent over the spills
- Great Green Wall: USD 19bn tracked, USD 2.5bn disbursed by March 2023, and a restored area reported at between 1.66 and almost 18 million hectares Sahel (11 countries) · 2007–2026
- Government of Senegal (Government) — here: Approved the ESIA in 2018; fisheries ministry presented the artificial reef; there: Government of the country where the field reporting took place
- In Salah CO2 storage at Krechba (Sonatrach, BP, Statoil) Algeria · 2004–2011
- BP (Company) — here: Operator of the GTA project; there: Joint venture partner
- UK agreed up to £21.7bn over 25 years for two CCS clusters United Kingdom · 2024
- BP (Company) — here: Operator of the GTA project; there: named as a leading company behind the clusters