Western gray whales off Sakhalin and the company-funded IUCN advisory panel
- Three of my females were killed in fishing nets off Japan in 2005; with that extra mortality the 2006 assessment gave about a 75% probability of decline and a risk above 25% of extirpation by 2030. International Whaling Commission Scientific Committee (NOAA archive)
- IUCN reported about 115 of me in 2004 and 174 in 2015, growing 3-4% a year. IUCN
- The panel's final statement gave 220-270 of me, not including first-year calves, feeding off Sakhalin and south-east Kamchatka as of 2020, growing around 5% a year over 1995-2020. IUCN SSC Cetacean Specialist Group
- The IUCN Cetacean Specialist Group archive lists my western subpopulation as Critically Endangered in 2000 and 2008 and Endangered in 2018. IUCN SSC Cetacean Specialist Group
- A study of the 2015 seismic surveys followed 1,270 tracks and 401 focal follows between 1 June and 30 September 2015, at received levels of 59-172 dB re 1 μPa² SPL; it found that mitigation "did not eliminate short-term behavioral responses" in me. Environmental Monitoring and Assessment (PMC)
- The panel said in 2015 that the combined planned seismic activity of two operators near my feeding area "was greater than had ever before occurred". IUCN
- Researchers Western Gray Whale Advisory Panel (IUCN), 8 May 2015: The combined planned seismic activity of SEIC and ENL was greater than had ever before occurred; SEIC's 2015 survey area was twice its 2010 survey; the panel advised postponement to 2016. IUCN
- Company or project Sakhalin Energy: Postponement was not feasible because of 2016-2017 activities of other operators; the State Environmental Expert Review issued a positive decision for the 2015 survey. Sakhalin Energy (via IUCN SSC Cetacean Specialist Group)
- Researchers Western Gray Whale Advisory Panel and IWC: A single shared photo-identification and genetic database was offered by the IWC. IUCN SSC Cetacean Specialist Group
- Company or project Exxon Neftegas Ltd (as described by the panel): Did not agree to the single shared database. IUCN SSC Cetacean Specialist Group
An advisory panel convened by IUCN and paid for by Sakhalin Energy as a lender condition advised on western gray whales near the Sakhalin oil and gas fields from 2006 until it ended in March 2022. In 2015 the panel and the company disagreed over the timing of seismic surveys, and the final meeting report was not released.
Estimate read from the budget chart in the 2018 IUCN-commissioned evaluation; chart values range from about USD 0.8 million (2006) to about USD 1.4 million (2010), about USD 0.8 million in 2018. Until 2012 the expenses were recoverable for the company under the production sharing agreement.
Status As of March 2022: the panel was disbanded when the IUCN-Sakhalin Energy contract expired; the final meeting report was never released and the panel's final statement went to the IWC Scientific Committee in April 2022.
- Sakhalin Energy — Met lender requirements through the panel and, in the 2018 evaluation's words, gained "increased trust and reputation"; expenses were recoverable under the production sharing agreement until 2012 IUCN
- Western Gray Whale Advisory Panel — Ended in March 2022 when the IUCN-Sakhalin Energy contract expired; its final report was never released IUCN SSC Cetacean Specialist Group
- Western gray whales — Short-term behavioural responses to the 2015 seismic surveys that mitigation did not eliminate Environmental Monitoring and Assessment (PMC)
- Western gray whales — Three females killed in fishing nets off Japan in 2005, raising the assessed probability of decline International Whaling Commission Scientific Committee (NOAA archive)
What happened
The IUCN Western Gray Whale Advisory Panel (WGWAP) was convened in October 2006 and first met in November 2006; Sakhalin Energy funded it to meet lender requirements ("a condition of the agreement set up by the banks and other lending institutions"). An earlier Independent Scientific Review Panel (September 2004 to January 2005) recommended that SEIC reroute, "at considerable expense", the offshore pipeline that would have crossed the whales' nearshore feeding area off Piltun Lagoon; the cost was not stated. Over its life the panel held 22 formal meetings and 38 closed task-force meetings, and the panel and its predecessors issued 639 recommendations between 2004 and 2021, mostly to Sakhalin Energy, "the only company formally participating". Its terms ran 2006-2011, 2012-2016 and 2017-2021; IUCN and Sakhalin Energy signed a 2017-2021 agreement in March 2017.
A 2006 assessment presented to the IWC Scientific Committee (Cooke, Weller, Bradford, Burdin, Brownell) counted 122 whales aged beyond calves (90% confidence interval 113-131) in 2006, including 30 mature females, with a 3.0% annual increase in 1994-2005; because three females were killed in fishing nets off Japan in 2005, it gave about a 75% probability of decline and a risk above 25% of extirpation by 2030. IUCN reported about 115 animals in 2004 and 174 in 2015, growing 3-4% a year. The panel's final statement gave growth of around 5% a year over 1995-2020, with 220-270 individuals, not including first-year calves, feeding off Sakhalin and south-east Kamchatka as of 2020. The IUCN Cetacean Specialist Group archive lists the western subpopulation as Critically Endangered in 2000 and 2008 and Endangered in 2018.
In February 2009 IUCN reported that the panel's fifth report criticised Sakhalin Energy's "inadequate collaboration on whale conservation" and that documents had not been delivered in time. On 8 May 2015 the panel issued a statement of concern: IUCN postponed its 16th meeting because Sakhalin Energy "had not delivered expected information and documents in a timely fashion or in some cases, at all"; the combined planned seismic activity of SEIC and Exxon Neftegas Ltd (ENL, operator of Sakhalin-1) "was greater than had ever before occurred", and SEIC's 2015 survey area was twice its 2010 survey; the panel advised postponement to 2016. SEIC replied that postponement was "not feasible" because of 2016-2017 activities of other operators, and that the State Environmental Expert Review had issued a positive decision for the 2015 survey. ENL ran a seismic programme near the feeding area in 2015, including work on behalf of Rosneft, and the panel said ENL did not seek its advice and had not provided detailed information on its marine mammal plan; ENL did not agree to a single shared photo-identification and genetic database offered by the IWC.
A 2018 IUCN-commissioned evaluation said Sakhalin Energy "did not comply, and chose to move forward with its seismic survey plans" in 2015. It recorded WGWAP budgets rising from about USD 0.8 million in 2006 to about USD 1.4 million in 2010 and falling back to about USD 0.8 million by 2018; it said the 2018 cumulative budget of the Joint Programme, the WGWAP and the monitoring programme was less than 55% of the 2014 cumulative budget, and that Sakhalin Energy first provided 2014-2018 budget data and then withdrew its permission for it to be included. The evaluation also said Russia's Ministry of Education and Science denied a permit for acoustic monitoring in 2018 "without explanation", and that the panel stated the monitoring plan could not be fully implemented without it.
The panel's final meeting took place in November 2021 in Gland; according to the IUCN Cetacean Specialist Group archive the final meeting report was finalised in January 2022 "but never released", and panel work was removed from the IUCN website after February 2022. The panel's final statement was submitted to the IWC Scientific Committee in April 2022. The panel was disbanded at the end of March 2022 "when the contract between IUCN and Sakhalin Energy Investment Company (Sakhalin Energy) expired". The statement noted that the implications of the March 2022 withdrawal of Shell and Exxon personnel for the Joint Programme and for a planned 2022 Piltun-Astokhskoye seismic survey were not known.
- 2004Independent Scientific Review Panel begins (September); its recommendation leads SEIC to reroute the offshore pipeline
- 2006Cooke et al. assessment of 122 whales (June); WGWAP convened (October) and first meets (November)
- 2009IUCN reports the panel's criticism of Sakhalin Energy's collaboration (12 Feb)
- 2015Panel statement of concern on combined seismic surveys (8 May); surveys run 1 June to 30 September
- 2016IUCN reports 174 whales in 2015 (3 Sep)
- 2017IUCN and Sakhalin Energy sign a 2017-2021 agreement (March)
- 2018Independent evaluation of the panel; acoustic monitoring permit denied by the Ministry of Education and Science
- 2021Final panel meeting in Gland (November)
- 2022Report finalised in January but not released; panel disbanded end of March; final statement sent to the IWC Scientific Committee in April
What was said
“This type of lender-company-panel relationship is rare if not unique.”
“Sakhalin Energy did not comply, and chose to move forward with its seismic survey plans”
“For Sakhalin Energy, funding the WGWAP is far more cost-efficient than not receiving international loans”
“Sakhalin Energy has reaped enormous benefits from the WGWAP through increased trust and reputation”
“had not delivered expected information and documents in a timely fashion or in some cases, at all”
“not feasible”
“ENL does not seek the Panel's advice”
“will depend on more companies in the region joining this effort”
Where accounts differ
Each party's account, side by side, with its source. The record does not settle these points; it shows them.
The combined planned seismic activity of SEIC and ENL was greater than had ever before occurred; SEIC's 2015 survey area was twice its 2010 survey; the panel advised postponement to 2016.
IUCNPostponement was not feasible because of 2016-2017 activities of other operators; the State Environmental Expert Review issued a positive decision for the 2015 survey.
Sakhalin Energy (via IUCN SSC Cetacean Specialist Group)A single shared photo-identification and genetic database was offered by the IWC.
IUCN SSC Cetacean Specialist GroupDid not agree to the single shared database.
IUCN SSC Cetacean Specialist GroupHow it looked
Shown
- The Company "has led its Grey Whale Monitoring Programme since 1997".Sakhalin Energy LLC website (current) · Sakhalin Energy LLC
- Postponement of the 2015 survey was "not feasible"; the State Environmental Expert Review issued a positive decision for the survey's environmental impact assessment.Sakhalin Energy, 2015 · Sakhalin Energy (via IUCN SSC Cetacean Specialist Group)
- Sakhalin Energy "has reaped enormous benefits from the WGWAP through increased trust and reputation".Independent evaluation commissioned by IUCN, 2018 · IUCN
Recorded
- Sakhalin Energy funded the WGWAP to meet lender requirements and funds 1.8 full-time-equivalent staff at IUCN to manage it.
- "Until 2012 these expenses were recoverable for the company under the Production Sharing Agreement (PSA)".
- The 2018 cumulative budget of the Joint Programme, the WGWAP and the monitoring programme was less than 55% of the 2014 cumulative budget.
- The WGWAP and Joint Programme budgets "are not reviewed regularly by Panel members or by lenders and their consultants".
- The panel and its predecessors issued 639 recommendations in 2004-2021; the panel held 22 formal and 38 closed task-force meetings.
- The 2010-2011 satellite tagging was co-sponsored by ENL, Sakhalin Energy and IUCN.
- The 2015 behavioural study acknowledges ENL for financial support.
- Obligations towards the whales were contractual (lender agreements and the Health, Safety, Environmental and Social Action Plan).
Who gained
Reached nature or the ground
Gained elsewhere
Responses on record
- Sakhalin Energy (2015): Postponement of the 2015 seismic survey was not feasible because of 2016-2017 activities of other operators; the State Environmental Expert Review issued a positive decision for the survey's environmental impact assessment. · Sakhalin Energy (via IUCN SSC Cetacean Specialist Group)
- Sakhalin Energy LLC (current website): The Company has led its Grey Whale Monitoring Programme since 1997. · Sakhalin Energy LLC
In court and with insurers
Lawsuits and rulings
Insurers
What nature saw
Nature's report opens this page. Below: further outcomes measured on the ground.
What we don't know
Nature
Money
- Not disclosed Offshore pipeline reroute away from the nearshore feeding area — Described as "at considerable expense"; amount not disclosed.
Court
- None on record No court case on record.
Record
- Insufficient Insufficient: the panel stated in 2015 that "at present there is insufficient information to support" a full cumulative-impact assessment.
- Not disclosed Not disclosed: detailed information on Exxon Neftegas Ltd's marine mammal monitoring and mitigation plan, which the panel said it had not been given; no independent observer was planned for ENL.
- Not measured Not measured: no exposure modelling had been conducted by either company for the staggered 2015 survey arrangement (panel statement).
- Not disclosed Not disclosed: the final panel meeting report, finalised in January 2022 and never released (IUCN Cetacean Specialist Group archive).
- Not disclosed Not disclosed: Sakhalin Energy's 2014-2018 budget data for the Joint Programme, the WGWAP and the monitoring programme, which it withdrew permission for the evaluators to include.
- None on record None on record: a court case concerning the whales; the obligations were contractual (lender agreements and the Health, Safety, Environmental and Social Action Plan).
- Not disclosed Not disclosed: the cost of the offshore pipeline reroute, described only as "considerable expense".
- Not disclosed Not disclosed: the amount co-sponsored by ENL, Sakhalin Energy and IUCN for the 2010-2011 satellite tagging.
- Unclear Unclear: the implications of the March 2022 withdrawal of Shell and Exxon personnel for the Joint Programme and the planned 2022 Piltun-Astokhskoye seismic survey (panel statement footnote).
Did the harm stop?
None on record.
Who paid?
Sakhalin Energy funded the panel as a lender requirement; until 2012 the expenses were recoverable for the company under the production sharing agreement.
Sources
Company or project
- Sakhalin Energy response to the May 2015 IUCN WGWAP statementSakhalin Energy (via IUCN SSC Cetacean Specialist Group) · 2015
- Sakhalin Energy: biodiversitySakhalin Energy LLC · n.d.
Government and regulators
- Loan agreement for Sakhalin II (Phase 2), NR/2008-22JBIC · 2008-06-16
Researchers
- Population assessment of Western Gray Whales in 2006 (Cooke, Weller, Bradford, Burdin, Brownell; IWC SC/58/BRG30)International Whaling Commission Scientific Committee (NOAA archive) · 2006-06
- Western gray whale behavioral response to seismic surveys during operations in their feeding grounds off Sakhalin, Russia (Gailey et al., Environmental Monitoring and Assessment 194:740)Environmental Monitoring and Assessment (PMC) · 2022-10-18
International bodies
- WGWAP Closing Statement (Reeves, Donovan, Weller)IUCN SSC Cetacean Specialist Group · 2022-04-13
- WGWAP statement of concern on 2015 seismic surveysIUCN · 2015-05-08
- Western Gray Whale Advisory Panel (WGWAP) archiveIUCN SSC Cetacean Specialist Group · n.d.
Connected cases
- Sakhalin-2: 2006 approval revocation, Gazprom stake purchase, 2009 damage-claim settlement and lender exits Russia · 2005–2009 Related matter
- Sakhalin Energy (Sakhalin Energy Investment Company, SEIC / Sakhalin Energy LLC) (Company) — here: Funded the panel as a lender requirement; operator of Sakhalin-2; there: Project operator; defendant in the RUB 390 million claim
- Japan Bank for International Cooperation (JBIC) (Government) — here: Lender whose loan conditions led to the panel; there: Lender: up to USD 3.7 billion for Phase 2
- European Bank for Reconstruction and Development (Bank) — here: Lender whose conditions shaped the panel process before leaving the financing; there: Stopped considering the financing in 2007
- Sakhalin-2 and Sakhalin-1 in 2022: transfer decrees, the ecological-audit deduction clause and write-downs Russia · 2022–2026 Related matter
- Sakhalin Energy (Sakhalin Energy Investment Company, SEIC / Sakhalin Energy LLC) (Company) — here: Funded the panel as a lender requirement; operator of Sakhalin-2; there: New Russian company holding SEIC's rights and obligations
- Exxon Neftegas Ltd (ENL) (Company) — here: Operator of Sakhalin-1; ran the 2015 seismic programme; there: Operator of Sakhalin-1
- African Parks Odzala-Kokoua abuses (Republic of Congo) Republic of Congo · 2010–2025
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Recommended deferral of World Heritage listing in 2022
- Baikal Natural Territory: expertise exemptions and clear-cutting rules Russia · 2020–2026
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Joint reactive monitoring mission with UNESCO planned for August 2026
- CAMPFIRE and elephant trophy hunting Zimbabwe · 2010–2015
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Policy guidance
- Colossal Biosciences: de-extinction ventures, funding and the Burgum remark United States · 2022–2026
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Its Canid Specialist Group stated the pups are not dire wolves
- Endorois and Lake Bogoria enzyme extraction (Kenya) Kenya · 1970–2026
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Technical evaluator whose recommendation led to the 2011 World Heritage listing
- Half-Earth and 30x30 advocacy funding (Wyss Campaign for Nature) Global · 2016–2026
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Co-author of the Protected Planet Report 2024
- Indorama Agro cotton project (Uzbekistan) Uzbekistan · 2021–2026
- European Bank for Reconstruction and Development (Bank) — here: Lender whose conditions shaped the panel process before leaving the financing; there: Lender; operator of the accountability mechanism handling the complaint
- Japan's JBIC financed Vietnam's Vung Ang 2 coal plant from an environment-labelled fund Vietnam · 2020–2021
- Japan Bank for International Cooperation (JBIC) (Government) — here: Lender whose loan conditions led to the panel; there: state-backed bank that provided the $636 million
- Kaeng Krachan: Karen evictions and the disappearance of Billy Thailand · 1981–2025
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Recommended against listing until Karen concerns were addressed
- Khimki forest and the M11 Moscow–St Petersburg toll motorway (km 15–58) Russia · 2007–2025
- European Bank for Reconstruction and Development (Bank) — here: Lender whose conditions shaped the panel process before leaving the financing; there: Memorandum signatory 2009; stated it was not financing the first stage
- Kiribati opens Phoenix Islands protected area to fishing; trust dissolved Kiribati · 2015–2021
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: reports the area's status in 2025
- Kiribati PIPA opened to fishing Kiribati · 2015–2025
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Assessed the property (World Heritage Outlook)
- Pacific tuna Vessel Day Scheme Pacific Islands (PNA members) · 2010–2025
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Assessor of the Phoenix Islands Protected Area
- Rio Tinto Juukan Gorge destruction Australia · 2020
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Conservation body in a Collaboration Agreement with Rio Tinto (2010)
- Save the Whales campaign and IWC whaling moratorium Global · 1971
- International Whaling Commission (International organisation) — here: Scientific Committee received the 2006 assessment and the panel's final statement; there: Adopted the moratorium (1982)
- Soviet whaling catches and the reports to the IWC, 1948–1979 Russia · 1948–1994
- International Whaling Commission (International organisation) — here: Scientific Committee received the 2006 assessment and the panel's final statement; there: Adopted Resolution 1994-6
- Turkish holdings' coal expansion alongside renewables (Cenal, Akbelen, İçdaş) Türkiye · 2021–2026
- European Bank for Reconstruction and Development (Bank) — here: Lender whose conditions shaped the panel process before leaving the financing; there: Lender
- UNESCO World Heritage listings and Indigenous rights Republic of the Congo, Kenya, Ethiopia, Uganda · 1991–2025
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Technical evaluator for natural sites
- US withdrawal from 66 international bodies and Paris/UNFCCC United States · 2025–2027
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Body the US withdrew from
- Usinsk pipeline spill (Komi, 1994) and the World Bank and EBRD emergency loans Russia · 1994–2004
- European Bank for Reconstruction and Development (Bank) — here: Lender whose conditions shaped the panel process before leaving the financing; there: Lender: US$25 million loan to the Russian Federation
- Uzbek cotton boycott ends forced labour Uzbekistan · 2017–2026
- European Bank for Reconstruction and Development (Bank) — here: Lender whose conditions shaped the panel process before leaving the financing; there: Lender to Indorama Agro (USD 70 million)
- Whale oil, kerosene and the 1986 whaling moratorium International · 1859–2022
- IUCN (International organisation) — here: Convened and hosted the Western Gray Whale Advisory Panel; there: Assessed the humpback whale (2008)