Maldives awards Gulhifalhu reclamation contract to Boskalis without tender
Short record: the main facts, with sources. A full case file has not been prepared.
The Gulhifalhu reclamation, presented as protection against rising seas, created 150 hectares from about 18 million cubic metres of sand. Save Maldives says it will destroy a 13 km² reef and a dive site protected since 1995.
- Boskalis — Gulhifalhu phase one fill, USD 53 million, awarded without tender Edition.mv
- Van Oord — Addu reclamation of 194 hectares, USD 84 million Edition.mv
- A Belgian dredging company — Hulhumalé phase two contract, about USD 59 million (company not named in the sources reviewed) Edition.mv
- ING — lender whose financing, according to the Finance Minister, required that the work go to a Dutch firm Edition.mv
- Gulhifalhu reef and dive area — reef and dive site protected since 1995, about 13 km² according to Save Maldives Edition.mv
- Seabed at Gulhifalhu — about 24.5 million cubic metres of sand removed, according to Save Maldives Edition.mv
What happened
Dredging Today reported in April 2024 that about 18 million cubic metres of sand had created 150 hectares of land at Gulhifalhu, presented as a plan against rising seas.
Save Maldives said 24.5 million cubic metres of seabed sand had been removed and that a 13 km² reef and a dive site protected since 1995 would be lost; according to the NGO, the minister accepted the damage.
Edition.mv reported in 2019 that the phase one Gulhifalhu fill had been awarded to Boskalis without tender for USD 53 million, and that the Finance Minister said the lender required the work to go to a Dutch firm.
Van Oord was contracted to reclaim 194 hectares at Addu for USD 84 million, financed by an Indian Exim Bank loan, for tourism (Edition.mv 2019).
In court and with insurers
Lawsuits and rulings
Insurers
What we don't know
Nature
- Not measured Harm to nature: The record holds no measurement of harm to nature.
Record
- Disputed Reported but not verified: the Save Maldives estimate of 24.5 million cubic metres differs from the 18 million reported by Dredging Today; the sources reviewed do not reconcile the two.
- None on record The sources reviewed do not name the Belgian dredging company for the Hulhumalé phase two contract.
- None on record The sources reviewed do not state whether the reef and dive site have been lost.
Did the harm stop?
Not stated in the sources reviewed.
Who paid?
Not stated in the sources reviewed.
Sources
Press and investigations
- Boskalis completes massive dredging and reclamation project in the MaldivesDredging Today · 2024-04-15
- Edition.mv report on Maldives dredging and reclamation contractsEdition.mv · 2019
Connected cases
- Lagos waterfront evictions (Otodo-Gbame, Badia East) and Eko Atlantic Nigeria · 2014–2026 Related matter
- Philippines activists Castro and Tamano disappearance Philippines · 2023–2025
- Boskalis (Company) — here: dredging contractor for Gulhifalhu phase one; there: Dredging contractor