Who gains from saving nature
Ledger 1 : 33 — For each dollar financing nature-based solutions in 2023, about $33 financed activities harmful to nature. (UNEP)
Cases / Oil, gas and coal operations · Chad · 2018–2024

Badila produced-water spill into the Nya Pendé river (2018) and the UK National Contact Point's Glencore statement

Nature's voice · report
On 10 September 2018 the earth bank of a produced-water basin at Badila collapsed and water entered my Nya Pendé river.
Did nature suffer? Yes. Harm is on record. Disputed
Recorded
  • RAID states that 85 million litres of wastewater flooded farmland and entered my river; the UK National Contact Point gives no volume and states the extent of the contamination of my water is unknown. UK National Contact Point for the OECD Guidelines
  • The operator tested my water daily against standards for sanitary sewage; the NCP's expert said the oil and gas discharge criteria were the relevant ones and only 3 of their 8 components were tested. UK National Contact Point for the OECD Guidelines
  • The complainants state that livestock and fish died; the NCP stated it cannot be concluded that the produced water would impact livestock, and that it is too late to determine the cause of the health impacts. UK National Contact Point for the OECD Guidelines
People
  • At least 50 people were injured.
    Reported by the complainants; the NCP stated the cause cannot now be determined.
What the record lacks: 4 none on record · 1 not disclosed · 1 insufficient · 1 not measured · 5 disputed · 2 unclear See the gaps
Accounts of the harm differ
Cause of the berm collapse
  • Company or project Glencore UK Ltd (respondent): Heavy rainfall brought the basin close to capacity; residents and the government refused a controlled release. UK National Contact Point for the OECD Guidelines
  • Government and regulators UK NCP and its expert: The berm should not have collapsed in the first instance; the expert found a design fault in the wetland and end-basin system, and there was no explanation of how the system got to the point where release was the only option. UK National Contact Point for the OECD Guidelines
Health and livestock harm
Alleged crude oil leak from a feeder pipeline around 26 September 2018
Volume of wastewater released

The earth bank of a produced-water basin at the Badila oilfield in southern Chad collapsed in September 2018 and released water into the Nya Pendé river. In November 2024 the UK National Contact Point found that Glencore UK Ltd did not comply with two OECD Guidelines due-diligence provisions and did not find it directly responsible for the spill.

85 million litresWastewater released (RAID figure)
Figure from RAID. The UK National Contact Point gives no volume and states the extent of contamination is unknown.

Status As of the Final Statement of 21 November 2024: the NCP follow-up date is given as July 2025 and as 21 November 2025; the complainants state no compensation has been paid.

What?
The earth bank of a produced-water basin at the Badila oilfield collapsed on 10 September 2018 and released water into the Nya Pendé river in southern Chad; the UK National Contact Point found in November 2024 that Glencore UK Ltd did not comply with two OECD Guidelines due-diligence provisions and did not find it directly responsible for the spill. UK National Contact Point for the OECD Guidelines
Where?
Badila oilfield, operated by PetroChad (Mangara), Doba basin, Logone Oriental, southern Chad; the Nya Pendé river. UK National Contact Point for the OECD Guidelines
When?
Berm collapse 10 September 2018; complaint filed 10 September 2020; Initial Assessment 22 January 2021; PCM sold June 2022; Final Statement 21 November 2024. UK National Contact Point for the OECD Guidelines
Who?
Gained
Lost
  • Residents of the Nya Pendé area — Farmland flooded; the complainants state no compensation has been paid RAID
Harmed
Why?
Glencore attributed the collapse to heavy rainfall; the NCP said the berm should not have collapsed and its expert found a design fault in the wetland and end-basin system. UK National Contact Point for the OECD Guidelines
How?
Residents and NGOs complained to the UK NCP under the OECD Guidelines; the respondent declined mediation, the NCP commissioned an expert opinion and published a Final Statement with four recommendations. UK National Contact Point for the OECD Guidelines
6 of 6 questions answered from the record

What happened

The record, in order.

On 10 September 2018 the earth bank (berm) of a produced-water basin at the Badila oilfield, operated by PetroChad (Mangara) (PCM) in the Doba basin of Logone Oriental, southern Chad, collapsed and water was released into the Nya Pendé river. Around 26 September 2018 residents alleged a crude oil leak from a feeder pipeline. The respondent, Glencore UK Ltd, attributed the collapse to heavy rainfall that brought the basin close to capacity and said PCM had asked residents and the government for a controlled release, which both refused. RAID stated that 85 million litres of wastewater flooded farmland and entered the river.

The UK National Contact Point (NCP) for the OECD Guidelines stated that the berm should not have collapsed in the first instance and that there was no explanation of how the system got to the point where release was the only option. Its expert found a design fault in the wetland and end-basin system. The NCP also recorded that PCM tested daily against IFC indicative values for sanitary sewage, which its expert said was the wrong standard: the IFC Onshore Oil and Gas discharge criteria are more relevant, and only 3 of their 8 components were tested. PCM's test results were not provided to the NCP.

The complainants said at least 50 of 106 residents interviewed reported injuries and that livestock and fish died. Glencore said that of the complaints received about the water release, none related to injuries, and told the NCP it "categorically refutes" health impacts. The NCP's expert said the injuries were unlikely given the hydrocarbon results and that other causes could not be excluded; the NCP said it was too late to determine the cause of the health impacts.

AJTZP, RAID and PILC filed the complaint with the NCP on 10 September 2020, on behalf of about 18,000 residents. The NCP accepted the 2018 spill and the alleged leak in its Initial Assessment of 22 January 2021; the respondent declined mediation in March 2022. Glencore plc sold PCM to Perenco in June 2022. The Final Statement of 21 November 2024 found that Glencore UK Ltd did not comply with two OECD Guidelines provisions on due diligence, did not find it directly responsible for the spill, and made four recommendations; no remedy for Badila was recommended. The complainants state that no compensation has been paid.

Separately, Glencore was Chad's main commercial creditor. Reuters reported in 2014 that Glencore and banks lent Chad's state oil firm about US$1.45 billion, repayable in crude oil cargoes, a debt that "has absorbed nearly all of Chad's oil profits". A February 2018 deal extended maturity and gave a two-year grace period on principal, after which the IMF disbursed about US$51 million.

  1. 2014Glencore and banks lend Chad's state oil firm about US$1.45 billion, repayable in crude oil cargoes
  2. 2018Berm of a produced-water basin collapses and water enters the Nya Pendé (10 Sep); alleged crude leak from a feeder pipeline (about 26 Sep); Glencore receives a single verbal report (13 Oct)
  3. 2020RAID publishes its report (16 Mar); AJTZP, RAID and PILC file the complaint with the UK NCP (10 Sep)
  4. 2021NCP Initial Assessment accepts the 2018 spill and the alleged leak (22 Jan)
  5. 2022Respondent declines mediation (March); Glencore plc sells PCM to Perenco (June); NCP expert opinion received (1 Nov)
  6. 2024NCP Final Statement published (21 Nov)

What was said

Claims, in the words of those who made them.

“the UK NCP does not find the Respondent directly responsible for the spill”

“it is now too late to determine the cause of these health impacts”

“Of the complaints received relating to the water release, none related to injuries.”

“Glencore UK should own up to its actions and provide full compensation to those affected.”

Aristote Benainou Ngarkaya, president of AJTZP · November 2024 · RAID

“it is troubling that the company is not being held accountable for remedying the damage caused.”

Anneke Van Woudenberg, RAID · November 2024 · RAID

Where accounts differ

Each party's account, side by side, with its source. The record does not settle these points; it shows them.

Cause of the berm collapse
Company or project
Glencore UK Ltd (respondent)

Heavy rainfall brought the basin close to capacity; residents and the government refused a controlled release.

UK National Contact Point for the OECD Guidelines
Government and regulators
UK NCP and its expert

The berm should not have collapsed in the first instance; the expert found a design fault in the wetland and end-basin system, and there was no explanation of how the system got to the point where release was the only option.

UK National Contact Point for the OECD Guidelines
Health and livestock harm
Communities and civil society
AJTZP, RAID and PILC

At least 50 of 106 residents interviewed reported injuries, and livestock and fish died.

UK National Contact Point for the OECD Guidelines
Company or project
Glencore UK Ltd (respondent)

Categorically refutes health impacts from the spill.

UK National Contact Point for the OECD Guidelines
Government and regulators
UK NCP

The expert said the injuries were unlikely given the hydrocarbon results and other causes could not be excluded; it is now too late to determine the cause.

UK National Contact Point for the OECD Guidelines
Alleged crude oil leak from a feeder pipeline around 26 September 2018
Communities and civil society
Residents

A crude oil leak occurred.

UK National Contact Point for the OECD Guidelines
Company or project
Glencore UK Ltd (respondent)

Contests the allegation.

UK National Contact Point for the OECD Guidelines
Government and regulators
UK NCP's expert

Found no conclusive evidence of a leak.

UK National Contact Point for the OECD Guidelines
Volume of wastewater released
Communities and civil society
RAID

85 million litres of wastewater.

Business & Human Rights Resource Centre / RAID
Government and regulators
UK NCP

Gives no volume; the extent of contamination is unknown.

UK National Contact Point for the OECD Guidelines

How it looked

What was shown, beside what was recorded.

Shown

  • Glencore (respondent before the NCP): heavy rainfall brought the basin close to capacity; PCM had asked residents and the government for a controlled release and both refused.
  • Glencore (respondent before the NCP): it "categorically refutes" health impacts from the spill.
  • RAID (November 2024): the UK government found Glencore UK breached the OECD Guidelines over the Chad spill.
  • AJTZP (November 2024): "The NCP's recommendations are insufficient."

Recorded

Who gained

Money that reached nature, beside money that stayed elsewhere.

Reached nature or the ground

Not published
Compensation or remedy for the spill—
The NCP Final Statement gives no amounts or number of people compensated; the complainants state none has been paid.

Gained elsewhere

Not totalled
Loan to Chad's state oil firm from Glencore and banks (context)≈ $1.4bn
Window: 2014
Reuters via Africanews; repayable in crude oil cargoes.
Rescheduled Glencore debt service (context)$400m
Window: 2015
EITI scoping study; 57% of debt service in 2015.
IMF disbursement after the February 2018 debt deal (context)≈ $51m
Window: 2018
Currency: USD · Window: Mixed — see each line. Figures cover different periods and are not compared as a ratio. * Estimate built from cited figures.

Responses on record

  • glencore (Before the NCP, 2020–2024): Categorically refutes health impacts from the spill; attributes the berm collapse to heavy rainfall; says PCM asked residents and the government for a controlled release and both refused; says the flood damage to farmland was remediated and a grievance register provided. · UK National Contact Point for the OECD Guidelines
  • glencore (2018–2020, as given in RAID's 2020 report): Of the complaints received relating to the water release, none related to injuries, so it did not investigate any complaints of this nature. · Business & Human Rights Resource Centre / RAID
  • chad-government (2018): The NCP records only that the government refused a controlled release and commissioned the Ecofilae report. · UK National Contact Point for the OECD Guidelines

In court and with insurers

Every proceeding and every insurer decision on record.

Lawsuits and rulings

  1. 2020–2024Outcome not on record
    AJTZP, RAID and PILC complaint about Glencore UK Ltd under the OECD Guidelines
    UK National Contact Point for the OECD Guidelines (Department for Business and Trade) · International court · AJTZP, RAID and PILC → Glencore UK Ltd

    Final Statement of 21 November 2024. Not complied with: Chapter II para A10 (risk-based due diligence) and Chapter IV para 5 (human rights due diligence). Complied with: Chapter II paras A1, 2, 6 and 14; Chapter III paras 1–4; Chapter VI paras 2a, 2b, 3, 4 and 5, because the respondent did not directly contribute to the impacts. The NCP stated it does not find the respondent directly responsible for the spill, made four recommendations on due diligence and grievance access, and recommended no remedy for Badila. The NCP is a non-judicial mechanism with no power to require any party to provide information to it. UK National Contact Point for the OECD Guidelines

Insurers

No insurer decision on record.

What nature saw

Outcomes measured on the ground, and nature's note.

Nature's report opens this page. Below: further outcomes measured on the ground.

Wastewater released
85 million litres
RAID's figure; the UK NCP gives no volume
Residents interviewed reporting injuries
at least 50 of 106
According to the complainants; the NCP stated the cause cannot now be determined
Discharge criteria components tested
3 of 8
Per the NCP's expert, on the IFC Onshore Oil and Gas criteria
Compensation recorded
none
The complainants state none has been paid; the NCP gives no amounts

What we don't know

Undisclosed, unproven, untried: recorded as data.

Nature

  • Disputed Cause of the berm collapse
  • Disputed Health and livestock harm
  • Disputed Alleged crude oil leak from a feeder pipeline around 26 September 2018
  • Disputed Volume of wastewater released

Money

  • None on record Compensation or remedy for the spill — The NCP Final Statement gives no amounts or number of people compensated; the complainants state none has been paid.

Court

  • Unclear AJTZP, RAID and PILC complaint about Glencore UK Ltd under the OECD Guidelines: outcome not on record.

Record

  • Not measured Not measured: the extent of water contamination and the volume of water released (UK NCP Final Statement).
  • Insufficient Insufficient: the NCP did not establish how long the water took to drain, the cause of the reported health impacts, any effect on livestock, or any crude oil leak around 26 September 2018.
  • Not disclosed Not disclosed: PCM's water test results were not provided to the NCP, and the respondent shared no evidence of due diligence on PCM.
  • None on record None on record: compensation amounts or the number of people compensated in the NCP Final Statement; the complainants state no compensation or remedy has been provided.
  • Disputed Disputed: the cause of the collapse, the health and livestock impacts, the alleged crude leak and the volume released (see disputes).
  • None on record None on record: a Chadian court case, fine or sanction over the 2018 spill; the NCP statement mentions none.
  • None on record None on record: insurance relating to the spill.
  • Unclear Unclear: the date of follow-up; the Final Statement gives July 2025 in its recommendations and 21 November 2025 in Annex 1.

Did the harm stop?

None on record. The berm collapse and water release were reported on 10 September 2018; the NCP did not establish how long the water took to drain.

Who paid?

The complainants state no compensation or remedy has been provided; the NCP Final Statement gives no amounts and recommended no remedy for Badila.

Sources

Voices on record: — Company or project✓ Government and regulators— Courts✓ Press and investigations✓ Communities and civil society— Researchers✓ International bodies

Press and investigations

Communities and civil society

  1. Glencore's oil operations in Chad: local residents injured and ignored
    Business & Human Rights Resource Centre / RAID · 2020-03-16

Connected cases

Related matters, and cases linked to this one through the same organisations, with the role each played in both.

Science and environment

Wetland
Land that is saturated or covered with water for long periods, such as marshes, swamps and peat bogs.

Institutions

OECD complaint
A complaint filed with a government's National Contact Point under the OECD Guidelines for Multinational Enterprises; the process is mediation, not a court.