Cases / Oil, gas and coal operations · Kazakhstan · 2023–2025

Karaturun well blowout and methane release (Mangystau, 2023)

Nature's voice · report
A study (preprint) estimated that 128 ± 36 kt of methane left my well site at Karaturun over 205 days in 2023, from 48 high-quality plume observations by satellites; its authors said the total exceeded all previously documented accidents of this kind.
Did nature suffer? Yes. Harm is on record. Disputed
Recorded
  • Kayrros estimated that methane left me at 35 to 107 tonnes per hour in 2023. Interfax
  • The Mangystau ecology department reported methane in my air at 480 times the established limit and oil products in my soil at 168.13 mg/kg; no norm was given for the soil figure. Bizmedia.kz
  • Prosecutors said about 60,000 cubic metres of gas burned above me each day. BES.media
What the record lacks: 3 none on record · 1 not disclosed · 1 not measured · 5 disputed · 1 unclear See the gaps
Accounts of the harm differ
Whether methane was released
  • Company or project Buzachi Neft: Satellite images likely showed hot vapour with minimal greenhouse gases; the burning mixture was mainly water with insignificant methane. Interfax
  • Government and regulators Deputy Minister of Ecology: The gas was flared following safety protocols; it would not be accurate to say pure methane was released. Vlast.kz quotes him as saying there was “no release of methane into the atmosphere”. Interfax
  • Researchers Kayrros and the satellite study: Kayrros estimated 35 to 107 tonnes of methane per hour; the study (preprint) estimated 128 ± 36 kt over 205 days. Guanter et al., EarthArXiv via UNESCO Open Science
Size of the methane release

A gas-water blowout at well No. 303 at the Karaturun field on 9 June 2023 ignited and burned for about 200 days. A study (preprint) estimated 128 ± 36 kt of methane released; Buzachi Neft paid environmental fines and was ordered by an Almaty court to pay KZT 2.27 billion for the burned gas.

KZT 2.27bnCourt award for burned gas, Almaty economic court, September 2024
KZT 2,269,347,033 plus KZT 68,080,411 state duty. The company argued for KZT 219 million at domestic gas prices.

Status As of March 2025: the September 2024 ruling stood without a reported appeal, and a first instalment of KZT 270 million was reported paid in January 2025.

What?
A gas-water blowout at well No. 303 at the Karaturun field on 9 June 2023 ignited and burned for about 200 days; a study (preprint) estimated 128 ± 36 kt of methane released. The operator paid environmental fines and was ordered to pay KZT 2.27 billion for the burned gas. Guanter et al., EarthArXiv via UNESCO Open Science
Where?
Karaturun field, north-west Buzachi peninsula, Mangystau region, Kazakhstan. Interfax
When?
Blowout 9 June 2023; flow stopped 25 December 2023; claim 12 April 2024; ruling September 2024; first instalment January 2025. Lada.kz
Who?
Gained
  • Kazakh state revenue — KZT 2.27 billion award for lost gas plus KZT 68.08 million state duty, payable in instalments; environmental damage assessment of KZT 361 million Lada.kz
Lost
  • Buzachi Neft — Environmental damage assessment and fine of about KZT 361–362 million; the award of KZT 2.27 billion Lada.kz
Harmed
Why?
A gas-water mixture blew out while a drilling tool was being lifted. The company cited a formation anomaly and no design violations; the claimant cited hydrocarbon losses not provided for in the basic project document. BES.media
How?
Satellite detections from June 2023, an ecology department inspection with four protocols in February 2024, and a Ministry of Energy inspectorate claim for burned gas granted in September 2024. Lada.kz
6 of 6 questions answered from the record

What happened

The record, in order.

On 9 June 2023 a gas-water mixture blew out while a drilling tool was being lifted at well No. 303 on the Karaturun field in the north-west of the Buzachi peninsula; the well ignited and a crater hindered firefighting (Interfax). The study authors and Interfax call the field Karaturun East; Kazakh press and the court call it Karaturun Yuzhny (South). The Mangystau ecology department said drilling began in May 2023 although permits allowed it no earlier than 2024, and that the fire lasted 200 days and was extinguished by 25 December 2023. The Universitat Politècnica de València described a 10-metre-high fire and a 15-metre-wide crater, with thousands of tonnes of water injected before the flow was stopped on 25 December 2023 with drilling mud.

A study (preprint) by Guanter and co-authors, posted on 13 March 2024 and later published in Environmental Science & Technology Letters, estimated that 128 ± 36 kt of methane was released over 205 days, from 48 high-quality plume observations by satellites including TROPOMI, GHGSat, PRISMA, EnMAP and EMIT, plus Sentinel-2 and Landsat. The authors said total emissions exceeded those of all previously documented accidents of this kind. Kayrros estimated an emission rate of 35 to 107 tonnes per hour in 2023, and SRON placed the release in the “ultra-emitter” class above 25 tonnes per hour. Prosecutors said about 60,000 cubic metres of gas burned per day.

The Mangystau ecology department reported methane in the air at 480 times the established limit and oil products in soil at 168.13 mg/kg, with no norm given. After a control inspection it drew up four administrative protocols in February 2024 and gave a preliminary fine estimate of over KZT 350 million; the plaintiff in the later gas-loss case said the company had paid an environmental damage assessment of KZT 361 million together with an administrative fine. On 12 March 2024 Deputy Minister of Ecology Zhomart Aliyev said the penalties exceeded KZT 500 million.

On 12 April 2024 the Western Interregional Department of the State Inspectorate in the Oil and Gas Complex of the Ministry of Energy sued Buzachi Neft LLP over the burned gas. In September 2024 the Specialised Interdistrict Economic Court of Almaty granted the claim: KZT 2,269,347,033 for lost raw gas plus KZT 68,080,411 in state duty, payable to state revenue, citing articles 123(3) and 125(2) of the Code on Subsoil and Subsoil Use. The gas was valued at average exchange prices for the period, specifically Dutch gas hub quotes; the company put the value at KZT 219 million at domestic prices. BES.media reported that the award was payable in instalments and that a first instalment of KZT 270 million was paid in January 2025.

The company said satellite images likely showed hot vapour with minimal greenhouse gases and that the burning mixture was mainly water with insignificant methane. Deputy Minister Aliyev said the gas was flared following safety protocols and that it would not be accurate to say pure methane was released. Buzachi Neft periodically blamed its exploration drilling contractor, named in Vlast.kz as Zaman Energo.

  1. 2023Drilling begins (May); blowout and ignition at well No. 303 (9 Jun); first clear TROPOMI detection (21 Jun); gas flow stopped with drilling mud (25 Dec); prosecutor's representation on eliminating violations (27 Dec)
  2. 2024Four administrative protocols (Feb); preprint on the methane release (13 Mar); Ministry of Energy inspectorate files gas-loss claim (12 Apr); peer-reviewed study published (Jul); Almaty court grants the claim (Sep)
  3. 2025First instalment of KZT 270 million paid (Jan), as reported by BES.media

What was said

Claims, in the words of those who made them.

“There was an accident at the field”

Zhomart Aliyev, Deputy Minister of Ecology · 12 March 2024 · Interfax

“When the accident happened, the gas was flared following safety protocols”

Zhomart Aliyev, Deputy Minister of Ecology · 12 March 2024 · Interfax

“no release of methane into the atmosphere”

Zhomart Aliyev, Deputy Minister of Ecology, as quoted by Vlast.kz · 2024 · Vlast.kz

“the release of gas from the emergency well decreased significantly”

Buzachi Neft · 16 October 2023 · Vlast.kz

“We are ready to pay 219 million, even if we are not obliged, because of the stability regime”

Buzachi Neft representative in court (translated) · August 2024 · translated from Russian · BES.media

“there is no universal solution to eliminate similar accidents”

Askhat Khasenov, vice-minister of Energy · 2023 · Vlast.kz

“We have continued to observe methane leaks from this asset regularly”

Where accounts differ

Each party's account, side by side, with its source. The record does not settle these points; it shows them.

Whether methane was released
Company or project
Buzachi Neft

Satellite images likely showed hot vapour with minimal greenhouse gases; the burning mixture was mainly water with insignificant methane.

Interfax
Government and regulators
Deputy Minister of Ecology

The gas was flared following safety protocols; it would not be accurate to say pure methane was released. Vlast.kz quotes him as saying there was “no release of methane into the atmosphere”.

Interfax
Researchers
Kayrros and the satellite study

Kayrros estimated 35 to 107 tonnes of methane per hour; the study (preprint) estimated 128 ± 36 kt over 205 days.

Guanter et al., EarthArXiv via UNESCO Open Science
Size of the methane release
Researchers
Preprint abstract (13 March 2024)

128 ± 36 kt over 205 days.

Guanter et al., EarthArXiv via UNESCO Open Science
Researchers
Universitat Politècnica de València press release (July 2024)

131,000 tonnes (printed “131.00”).

Universitat Politècnica de València
Press and investigations
Vlast.kz (July 2024)

134,000 tons over six and a half months, 4.5% of Kazakhstan's 2023 energy-sector emissions and at least 30% larger than Aliso Canyon (2015).

Vlast.kz
Value of the burned gas
Government and regulators
Ministry of Energy inspectorate

Lost gas valued at average exchange prices for the period, specifically Dutch gas hub quotes: KZT 2.27 billion.

BES.media
Company or project
Buzachi Neft

KZT 219 million at domestic prices; ready to pay it because of the contract stability regime.

BES.media
Courts
Specialised Interdistrict Economic Court of Almaty

Granted KZT 2,269,347,033 plus KZT 68,080,411 state duty.

Lada.kz
Amount of the environmental fines
Government and regulators
Mangystau ecology department (February 2024)

Preliminary fine estimate of over KZT 350 million after four protocols.

Bizmedia.kz
Government and regulators
Gas-loss plaintiff (August 2024) and Vlast.kz

KZT 361 million environmental damage assessment paid with an administrative fine; KZT 362 million proposed by local inspectors.

BES.media
Government and regulators
Deputy Minister of Ecology (12 March 2024)

Penalties exceed KZT 500 million (about US$1.1 million, per Interfax).

Interfax
Cause of the blowout and responsibility
Company or project
Buzachi Neft

Design-institute opinions found a formation anomaly and no design violations; the company periodically blamed its exploration drilling contractor, named in Vlast.kz as Zaman Energo.

BES.media
Government and regulators
Ministry of Energy inspectorate

The claim rests on articles 123(3) and 125(2) of the Code on Subsoil and Subsoil Use: production must be carried out by methods excluding hydrocarbon losses not provided for by the basic project document. The environmental fine covered the accident itself; the claim covers burned gas that could have supplied Mangystau residents.

BES.media

How it looked

What was shown, beside what was recorded.

Shown

  • Satellite images likely showed hot vapour with minimal greenhouse gases; the burning mixture was mainly water with insignificant methane.
    Buzachi Neft, 2023, as reported by Interfax · Interfax
  • No burning charge ignited the cloud, which would be impossible if methane were present in significant concentration.
    Buzachi Neft deputy general director, August 2023, as reported by Vlast.kz · Vlast.kz
  • It would not be accurate to say that pure methane was released.
    Zhomart Aliyev, Deputy Minister of Ecology, 12 March 2024 · Interfax

Recorded

  • Methane released: 128 ± 36 kt over 205 days, from 48 high-quality plume observations (study, preprint of 13 March 2024).
  • Methane in air 480 times the established limit and oil products in soil at 168.13 mg/kg (Mangystau ecology department); methane concentrations on 9 June 2023 exceeded the permissible level of 2,540 mg/m3 (Mangystau ecology department, October 2023).
  • Court award of KZT 2,269,347,033 plus KZT 68,080,411 state duty for lost raw gas (Specialised Interdistrict Economic Court of Almaty, September 2024).
  • Environmental damage assessment of KZT 361 million paid together with an administrative fine (plaintiff's statement, August 2024); KZT 362 million fine proposed by local inspectors in February 2024 (Vlast.kz).
  • The Tax Code sets a methane payment rate of 0.02 MRP per tonne from stationary sources (article 576 para 2, as amended by Law No. 402-VI of 2 January 2021); a halved rate of 0.01 MRP applied until 1 January 2025.

Who gained

Money that reached nature, beside money that stayed elsewhere.

Reached nature or the ground

Not published
Remediation or restoration—
The Mangystau ecology department ordered the company to prepare and implement a remediation plan (February 2024); no source gives remediation spending.

Gained elsewhere

Not totalled
Environmental damage assessment, paid with an administrative fine361m
Window: 2024
Stated by the plaintiff in the gas-loss case, August 2024.
Damages for lost (burned) raw gas, payable to state revenue2.3bn
Window: 2024
Plus KZT 68.08 million state duty. Valued at Dutch gas hub quotes.
State duty68m
Window: 2024
Company's counter-figure for the gas at domestic prices219m
Window: 2024
First instalment toward the award270m
Window: 2025
Currency: KZT · Window: 2024–2025 (mixed — see each line). Figures cover different periods and are not compared as a ratio. * Estimate built from cited figures.

Responses on record

  • Buzachi Neft (2023): Satellite images likely showed hot vapour with minimal greenhouse gases; the burning mixture was mainly water with insignificant methane. · Interfax
  • Buzachi Neft (August 2024): In court it argued a 2001 contract stability clause, domestic gas prices (export banned) and design-institute opinions finding a formation anomaly and no design violations; it was ready to pay KZT 219 million. · BES.media
  • Ministry of Ecology (September–October 2023): The Minister said he had “not heard” about the fire, and later that the ministry “periodically” monitors Karaturun. · Vlast.kz

In court and with insurers

Every proceeding and every insurer decision on record.

Lawsuits and rulings

  1. 2024–2024Claimant wonKZT 2.27bn damages for lost raw gas, plus KZT 68.08m state duty
    Ministry of Energy inspectorate v. Buzachi Neft (lost raw gas)
    Specialised Interdistrict Economic Court of Almaty · Civil · Western Interregional Department of the State Inspectorate in the Oil and Gas Complex, Ministry of Energy → Buzachi Neft LLP

    Claim filed 12 April 2024 and granted in September 2024: KZT 2,269,347,033 for lost (burned) raw gas plus KZT 68,080,411 state duty, payable to state revenue, under articles 123(3) and 125(2) of the Code on Subsoil and Subsoil Use. The sources give no case number and mention no appeal; payment in instalments was reported from January 2025. Lada.kz

  2. 2024–2024Claimant wonKZT 361m environmental damage assessment, paid with an administrative fine
    Mangystau Department of Ecology inspection of Buzachi Neft
    Mangystau Region Department of Ecology (administrative protocols) · Administrative · Mangystau Region Department of Ecology → Buzachi Neft LLP

    A control inspection ended in February 2024 with four administrative protocols and an order to prepare and implement a remediation plan; the preliminary fine estimate was over KZT 350 million. Bizmedia.kz

  3. 2023–Outcome not on record
    Specialised environmental prosecutor's representation to Buzachi Neft
    Specialised environmental prosecutor's office · Regulatory · Specialised environmental prosecutor's office → Buzachi Neft LLP

    A representation on eliminating violations was issued on 27 December 2023. Lada.kz

Insurers

No insurer decision on record.

What nature saw

Outcomes measured on the ground, and nature's note.

Nature's report opens this page. Below: further outcomes measured on the ground.

Methane released
128 ± 36 kt
Over 205 days, according to a study (preprint) using satellite data
Duration of the fire
About 200 days
Extinguished by 25 December 2023, per the Mangystau ecology department
Award for burned gas
KZT 2.27bn
Almaty economic court, September 2024; payable in instalments
Environmental damage assessment
KZT 361m
Paid with an administrative fine

What we don't know

Undisclosed, unproven, untried: recorded as data.

Nature

Money

  • None on record Remediation or restoration — The Mangystau ecology department ordered the company to prepare and implement a remediation plan (February 2024); no source gives remediation spending.

Court

  • Unclear Specialised environmental prosecutor's representation to Buzachi Neft: outcome not on record.

Accounts

  • Disputed Value of the burned gas
  • Disputed Amount of the environmental fines
  • Disputed Cause of the blowout and responsibility

Record

  • Not measured Not measured: a monetary figure for the climate effect of the methane; the court award values the burned gas at commodity prices and the fines relate to limit exceedances.
  • Not disclosed Not disclosed: the total volume of gas burned; the court stated only the daily rate.
  • None on record None on record: a court case behind the fines reported by Interfax in March 2024.
  • None on record None on record: insurance cover or insurance payments.

Did the harm stop?

The gas flow was stopped on 25 December 2023 by injecting drilling mud, about 200 days after the blowout on 9 June 2023.

Who paid?

Buzachi Neft paid an environmental damage assessment and fine of about KZT 361–362 million and was ordered to pay KZT 2.27 billion for the burned gas to state revenue, in instalments from January 2025. The award is calculated on the value of the gas.

Sources

Voices on record: — Company or project✓ Government and regulators— Courts✓ Press and investigations— Communities and civil society✓ Researchers

Government and regulators

  1. Law No. 402-VI of 2 January 2021 amending the Tax Code (via zakon.uchet.kz, in Russian)
    Republic of Kazakhstan (legal database reproduction) · 2021-01-02

Researchers

  1. Multi-satellite data depicts record-breaking methane leak from a well blowout (preprint record)
    Guanter et al., EarthArXiv via UNESCO Open Science · 2024-03-13
  2. Nature Research Highlight (press release on the study)
    Universitat Politècnica de València · 2024-07-16

Connected cases

Related matters, and cases linked to this one through the same organisations, with the role each played in both.

Law and courts

Arbitration
A private dispute process in which an appointed arbitrator, instead of a court, decides the case.
Oil, gas and coal operations · Finance, funds and markets · Burning: incineration, open burning, flaring, fires · Kazakhstan · 2017–2026
Almaty CHP-2 coal-to-gas conversion, Kazakhstan
Same type: Oil, gas and coal operations, Burning: incineration, open burning, flaring, firesSame countryHarm to nature disputed
Oil, gas and coal operations · Finance, funds and markets · Burning: incineration, open burning, flaring, fires · Mongolia · 2008–2024
Ulaanbaatar winter air pollution: stove programmes, the 2019 raw-coal ban and subsidised briquettes
Same type: Oil, gas and coal operations, Burning: incineration, open burning, flaring, firesSame regionCourt: outcome not on record
Oil, gas and coal operations · Burning: incineration, open burning, flaring, fires · Turkmenistan · 2017–2026
Methane super-emitters in Turkmenistan's oil and gas fields
Same type: Oil, gas and coal operations, Burning: incineration, open burning, flaring, firesSame regionHarm to nature disputed
Oil, gas and coal operations · Burning: incineration, open burning, flaring, fires · Turkmenistan · 1971–2026
Darvaza gas crater: orders to extinguish the fire, wells drilled, methane measured
Same type: Oil, gas and coal operations, Burning: incineration, open burning, flaring, firesSame regionHarm to nature disputed
Oil, gas and coal operations · Chemical pollution · Burning: incineration, open burning, flaring, fires · Iran · 2005–2026
South Pars and Assaluyeh: sulphur dioxide emissions and the pollution levy
Same type: Oil, gas and coal operations, Burning: incineration, open burning, flaring, firesCourt: outcome not on recordHarm to nature disputed
Oil, gas and coal operations · Burning: incineration, open burning, flaring, fires · Chemical pollution · Iran · 2020–2026
Mazut burning in Iranian power plants, 2020–2025
Same type: Oil, gas and coal operations, Burning: incineration, open burning, flaring, firesCourt: won by claimantHarm to nature disputed