Addis Ababa's Reppie waste-to-energy plant reported at half capacity
Short record: the main facts, with sources. A full case file has not been prepared.
- The record does not name which of my species, waters, soils or forests were harmed.
Ethiopia's Reppie incineration plant in Addis Ababa is reported to run at half its capacity, and GAIA said it processes 396 to 650 tonnes a day against a 1,400-tonne design. At stake for nature is whether burning waste at Reppie reduces what goes to the Koshe dump.
- Reppie plant (operator not named in the sources reviewed) — About 240 million birr a year in compensation The Reporter
What happened
The Reporter reported in March 2025 that the Reppie plant was operating at 50% capacity, with about 240 million birr a year paid to it in compensation.
GAIA, reported by Packaging Insights in November 2025, said the plant processes 396 to 650 tonnes a day against a design capacity of 1,400 tonnes a day.
GAIA also said about 3,000 tonnes still go to the Koshe dump.
In court and with insurers
Lawsuits and rulings
Insurers
What we don't know
Nature
- Not measured Harm to nature: The record holds no measurement of harm to nature.
Record
- Insufficient Reported but not verified: GIZ's 2023 sector summary puts Koshe's share of collected waste in Addis Ababa at about 85% (the PDF could not be checked; secondary report only).
- None on record Not stated in the sources reviewed: who pays the 240 million birr, and the contract terms behind it.
- None on record Not stated in the sources reviewed: the plant's operator, and effects on people living near the Koshe dump.
Did the harm stop?
Not stated in the sources reviewed.
Who paid?
Not stated in the sources reviewed.