Duke Energy coal ash insurance dispute

Nature's voice · report
No measurement of the harm done to me here is on record.
Did nature suffer? Not measured.
What the record lacks: 1 none on record · 3 insufficient · 1 not measured · 1 disputed · 2 unclear See the gaps

In 2017 Duke Energy sued about 30 insurers over coverage for coal ash cleanup liabilities estimated at $5.1 billion. Settlements with 23 insurers brought in about $418 million by August 2021; regulators separately allowed part of the cost to be passed to customers.

about $418m of $5.1bn estimateSettlements received vs liability estimate at filing
Duke's liability estimate in 2017 compared with settlements received through August 2021; the two figures are from different dates.

Status As of August 2021: Duke reached 14 settlements with 23 insurers, the last in August 2021, for about $418 million; the January 2021 rate settlement keeps part of the cleanup cost with customers.

What?
Duke Energy sued about 30 insurers over coverage for coal ash cleanup liabilities; 23 insurers settled for about $418 million, and regulators separately set how much of the cost customers would bear.
Where?
North Carolina and South Carolina; North Carolina Business Court; the Mayo plant is named in the court's ruling. Indiana Business Journal (ibj.com)
When?
Policies from the early 1970s to the mid-1980s; claims in the 1990s; suit filed 29 March 2017; last insurer settlement August 2021. Indiana Business Journal (ibj.com)
Who?
Gained
  • Insurers — Paid about $418 million in settlements against a $5.1 billion liability estimate; the court did not find intentional damage proved at the Mayo plant.
  • Duke Energy — Continues to earn a return on remaining cleanup costs at a lower rate than it had proposed (January 2021 settlement). Utility Dive
Lost
  • Duke Energy Progress customers — Fixed monthly charge rose 25%, from $11.13 to $14, allowing recovery of $232 million (February 2018). Appalachian Voices
Harmed
  • Groundwater (US-wide figure, not specific to Duke sites) — 91% of US plants with ash ponds (265 of 292) contaminate groundwater (2022).
Why?
Insurers refused cover on the grounds of intentional damage, Duke's knowledge of environmental problems, the absence of a distinct pollution event and earlier claims on the same ponds. Indiana Business Journal (ibj.com)
How?
Duke sued for coverage under old general liability policies; the court ruled on allocation and intent at summary judgment; 14 settlements followed. The Utilities Commission separately set cost recovery from customers. Indiana Business Journal (ibj.com)
6 of 6 questions answered from the record

What happened

The record, in order.

Duke Energy's coal ash ponds in North Carolina and South Carolina produced cleanup liabilities. The estimate recorded in the case was $5.1 billion, and more than $725 million had been spent by November 2016.

On 29 March 2017 Duke sued about 30 insurers in North Carolina state Business Court. The claims rested on 57 general liability policies written from the early 1970s to the mid-1980s. AEGIS, an insurer based in Bermuda, filed its own federal suit the same day, saying that Duke's predecessors had tried and failed to get it to pay on claims made in 1996 and that it was “now too late to go to court”.

The insurers gave several grounds: that the damage “was caused intentionally, by or at Duke's direction”; that Duke “continued to dispose of (coal ash) in unlined ash ponds long after it knew it had environmental problems”; that there were no distinct pollution events (an “occurrence” under the policies); and that Duke had made claims for the same ponds in the 1990s.

Chief Judge Bledsoe found on summary judgment that the insurers had not proved intentional damage at the Mayo plant, and ruled that “all sums” allocation applies to the insurers TIG and Ranger. Duke reached 14 settlements with 23 insurers, the last in August 2021, and received about $418 million. Two foreign insurers defaulted.

Separately, regulators decided how much of the cleanup cost customers would bear. In February 2018 the North Carolina Utilities Commission allowed Duke Energy Progress to recover $232 million, raising customers' fixed monthly charge from $11.13 to $14 (25%), and imposed a $30 million penalty for mismanagement. In a January 2021 settlement Duke agreed not to pass about $1.1 billion of a cleanup plan estimated at $8–9 billion on to customers, and it continues to earn a return on the remaining costs at a lower rate than it had proposed.

  1. 1996Claims made to AEGIS by Duke's predecessors (per AEGIS)
  2. 2016More than $725m spent on coal ash by November
  3. 2017Duke sues about 30 insurers in North Carolina Business Court; AEGIS files its own federal suit the same day (29 March)
  4. 2018Utilities Commission lets Duke Energy Progress recover $232m and imposes a $30m penalty (23 February)
  5. 2021Settlement with regulators and customers' side (January); last of 14 insurer settlements (August)

What was said

Claims, in the words of those who made them.

“was caused intentionally, by or at Duke's direction”

“continued to dispose of (coal ash) in unlined ash ponds long after it knew it had environmental problems”

“now too late to go to court”

Where accounts differ

Each party's account, side by side, with its source. The record does not settle these points; it shows them.

Were the insurers liable under the 1970s and 1980s general liability policies for the coal ash damage?
Company or project
Duke Energy

Sued about 30 insurers in March 2017 over 57 general liability policies, with a liability estimate of $5.1 billion.

Indiana Business Journal (ibj.com)
Company or project
Insurers (about 30)

The damage “was caused intentionally, by or at Duke's direction”; Duke “continued to dispose of (coal ash) in unlined ash ponds long after it knew it had environmental problems”; there were no distinct pollution events; Duke had made claims on the same ponds in the 1990s.

Indiana Business Journal (ibj.com)
Courts
Chief Judge Bledsoe, North Carolina Business Court

Insurers had not proved intentional damage at the Mayo plant on summary judgment; “all sums” allocation applies to TIG and Ranger.

Indiana Business Journal (ibj.com)

How it looked

What was shown, beside what was recorded.

Shown

    Recorded

    • Duke's suit named about 30 insurers and 57 general liability policies from the early 1970s to the mid-1980s; the liability estimate was $5.1 billion and more than $725 million had been spent by November 2016.
    • Insurers argued the damage was intentional, that Duke kept using unlined ponds after it knew of environmental problems, that there was no distinct pollution event, and that Duke had made claims on the same ponds in the 1990s.
    • On summary judgment Chief Judge Bledsoe found the insurers had not proved intentional damage at the Mayo plant and ruled that “all sums” allocation applies to TIG and Ranger.
    • 14 settlements with 23 insurers, the last in August 2021, brought in about $418 million. Two foreign insurers defaulted.
    • February 2018: fixed monthly charge for Duke Energy Progress customers rose from $11.13 to $14 (25%), allowing recovery of $232 million; the commission imposed a $30 million mismanagement penalty.
    • January 2021 settlement: Duke agreed not to pass about $1.1 billion of an $8–9 billion plan on to customers and continues to earn a return on the remaining costs at a lower rate than it had proposed.

    Who gained

    Money that reached nature, beside money that stayed elsewhere.

    Reached nature or the ground

    Not published
    No figure published.

    Gained elsewhere

    Not totalled
    Currency: USD · Window: 2017–2021. All figures cover the same period. * Estimate built from cited figures.

    Responses on record

    • aegis-bermuda (2017-03-29): Filed its own federal suit the same day as Duke's, saying Duke's predecessors had tried and failed to get it to pay on 1996 claims and that it was “now too late to go to court”. · Indiana Business Journal (ibj.com)

    In court and with insurers

    Every proceeding and every insurer decision on record.

    Lawsuits and rulings

    1. 2017-03-29–2021-08Settled$418m about $418 million received in settlements (millions of dollars)
      Duke Energy v. about 30 insurers (coal ash coverage)
      North Carolina Business Court · Civil · Duke Energy → About 30 insurers

      Claim under 57 general liability policies from the early 1970s to the mid-1980s. The insurers argued intentional damage, knowledge of environmental problems, no distinct pollution event and earlier claims on the same ponds. The court found on summary judgment that intentional damage had not been proved at the Mayo plant and that “all sums” allocation applies to TIG and Ranger. 14 settlements were reached with 23 insurers, the last in August 2021; two foreign insurers defaulted.

    2. 2017-03-29–Outcome not on record
      AEGIS v. Duke Energy
      US federal court (court not specified in the record) · Civil · AEGIS (Bermuda) → Duke Energy

      AEGIS filed its own suit the same day as Duke's, saying Duke's predecessors had tried and failed to get it to pay on claims made in 1996 and that it was “now too late to go to court”. The outcome is not given in the record. Indiana Business Journal (ibj.com)

    3. 2018-02-23Outcome not on record
      Duke Energy Progress rate case (coal ash cost recovery)
      North Carolina Utilities Commission · Regulatory · Duke Energy Progress → Not stated (customer ratepayers and intervenors)

      The commission raised the fixed monthly charge for Duke Energy Progress customers from $11.13 to $14 (25%), allowing recovery of $232 million spent by the company, and imposed a $30 million mismanagement penalty. The hearing included testimony from a customer. The record does not state how this compares with what Duke sought. Appalachian Voices

    4. 2021-01Settled
      January 2021 coal ash cost settlement
      North Carolina (counterparties not specified in the record) · Regulatory · Not specified → Duke Energy

      Duke agreed not to pass about $1.1 billion of a cleanup plan estimated at $8–9 billion on to customers. It continues to earn a return on the remaining costs, at a lower rate than it had proposed. Utility Dive

    Insurers

    1. 2021Refused, paid after suit$418m about $418 million received in settlements (millions of dollars)
      About 30 insurers, including TIG and Ranger → Duke Energy
      Stated reason: Insurers argued the damage was intentional, that Duke kept using unlined ponds after it knew of environmental problems, that there was no distinct pollution event and that Duke had made claims on the same ponds in the 1990s.

      Duke sued in March 2017. 14 settlements with 23 insurers followed, the last in August 2021; two foreign insurers defaulted. The liability estimate at filing was $5.1 billion.

    2. 2017In litigation
      AEGIS (Bermuda) → Duke Energy
      Stated reason: AEGIS said the claims, made by Duke's predecessors in 1996, were out of time: “now too late to go to court”.

      AEGIS filed its own federal suit the same day as Duke's. The outcome is not given in the record. Indiana Business Journal (ibj.com)

    What nature saw

    Outcomes measured on the ground, and nature's note.

    Nature's report opens this page. Below: further outcomes measured on the ground.

    US plants with ash ponds that contaminate groundwater
    91% (265 of 292)
    Nationwide figure for 2022; not specific to Duke Energy sites
    US plants with ash ponds that chose a cleanup plan including treatment
    4% (11)
    Nationwide figure for 2022; not specific to Duke Energy sites

    What we don't know

    Undisclosed, unproven, untried: recorded as data.

    Nature

    • Not measured Harm to nature: The record holds no measurement of harm to nature.

    Court

    • Unclear AEGIS v. Duke Energy: outcome not on record.
    • Unclear Duke Energy Progress rate case (coal ash cost recovery): outcome not on record.

    Accounts

    • Disputed Were the insurers liable under the 1970s and 1980s general liability policies for the coal ash damage?

    Record

    • Insufficient Reported but not independently verified: that in 2017 the Utilities Commission allowed Duke to pass all coal ash cleanup costs to customers except a $100 million environmental penalty.
    • Insufficient Reported but not independently verified: that the North Carolina Supreme Court partly reversed the Commission's decision in December 2020.
    • Insufficient Reported but not independently verified: that under the 2021 settlement shareholders bore about three-quarters of the cost of the unlined ponds.
    • None on record The outcome of the AEGIS federal suit is not given in the record.

    Did the harm stop?

    The insurance suits ended with settlements, the last in August 2021.

    Who paid?

    Insurers paid about $418 million in settlements against a $5.1 billion liability estimate. Customers were allowed to bear part of the rest through rates; under the January 2021 settlement about $1.1 billion of an $8–9 billion plan was not passed on to them.

    Sources

    Voices on record: — Company or project— Government and regulators— Courts✓ Press and investigations✓ Communities and civil society— Researchers

    Communities and civil society

    Connected cases

    Related matters, and cases linked to this one through the same organisations, with the role each played in both.

    Science and environment

    Groundwater
    Water held underground in soil and rock, drawn through wells.