Cases / Water use · Kazakhstan · 2013–2026

Port and channel dredging on the Caspian after the fall in water level: Kazakhstan, Azerbaijan and Russia

Nature's voice · report
20.6 billion KZT were budgeted in my name.
Did nature suffer? Not measured.
Not on record
  • The record does not name which of my species, waters, soils or forests were harmed.
Details not on record: 2 none on record · 1 insufficient · 1 not measured · 4 disputed · 1 unclear See the gaps

Falling water forced dredging at Caspian ports and shipping channels. The Astana Times (13 October 2026) reported the Aktau port dredging project at 20.6 billion tenge; the Times of Central Asia (9 September 2026) listed about US$56.8 million for Kuryk, US$39.8 million for Aktau and US$17.6 million for Bautino. Azerbaijan and Russia reported volumes dredged without costs.

20.6 billion tengeAktau port dredging project cost as stated, October 2026
Astana Times, 13 October 2026, which gives US$45.6 million alongside; the Times of Central Asia (9 September 2026) gives about US$39.8 million for Aktau dredging.

Status As of October 2026: Kuryk dredging was completed in November 2024; the main Aktau phase began in October 2026 for completion at the end of 2026; costs are given for Kazakhstan only and differ between sources.

What?
Ports and shipping channels on the Caspian were dredged because falling water limited vessel loads and access; Kazakhstan's Aktau project is reported at 20.6 billion tenge. The Astana Times
Where?
Aktau, Kuryk and Bautino ports (Kazakhstan, Mangystau region), the Dubendi terminal at Baku (Azerbaijan) and the Volga-Caspian Sea Shipping Canal at Astrakhan (Russia). The Astana Times
When?
Kuryk dredging 2024; Aktau from May 2025 with the main phase from October 2026 to the end of 2026; Rosmorport canal dredging from 2 April 2025; Dubendi dredging in 2024. The Astana Times
Who?
Gained
  • Jan De Nul Kazakhstan LLP — General contractor for the Kuryk dredging completed in November 2024; contract value not on record Kazakhstan Temir Zholy
  • China Harbour Engineering Company — General contractor for the 2026 Aktau dredging, per the Astana Times; contract value not on record The Astana Times
  • Rosmorport — State agency carrying out the Volga-Caspian canal dredging; budget not on record Ports Europe
Lost
  • Shipping operators using Kazakh ports — Ferries carried only 80% of a full cargo load from Kazakhstan; re-berthing of grain vessels at Aktau cost about 1 million tenge per ship (Astana Times) The Times of Central Asia
  • Baku International Sea Port — Dubendi oil terminal throughput fell to 810,000 tons in the first half of 2025 from 880,000 tons; its director linked this to the water level Baird Maritime (Reuters)
Harmed
None on record
Why?
Falling Caspian water level reduced depths: Aktau averaged 4.5 m against 6.5–7 m needed; Court et al. note dredging to keep Volga passage open. The Astana Times
How?
Cutter-suction and other dredgers removed seabed material: Jan De Nul's Vesalius at Kuryk, ERSAI's own dredger at its Kuryk port, China Harbour Engineering at Aktau, Rosmorport and contractor vessels in the Volga canal. Kazakhstan Temir Zholy
6 of 6 questions (what, who, where, when, why, how) have an answer on record

What happened

The record, in order.

Court et al. (Communications Earth & Environment, 10 April 2025) wrote that access to the Caspian from the Volga could be compromised by a decline of as little as 5 m, "with dredging already implemented to keep passage for larger vessels open", that operators of offshore oil facilities in the northern Caspian "are dredging channels to maintain shipping logistics", and that operations at Aktau port and a desalination plant intake had been disrupted by declining water levels. Kazakhstan's Transport Minister Marat Karabaev said in December 2023, according to Ports Europe, that urgent dredging at Kuryk would be completed by July 2024. Kazakhstan Temir Zholy announced on 21 November 2024 that Kuryk dredging had finished ahead of schedule, with over 990,000 cubic metres removed in four months by Jan De Nul Kazakhstan LLP and a depth of 7 to 8 m in the port and approach channel; no cost was stated.

Aktau port dredging began in 2025. The Times of Central Asia reported on 12 May 2025, crediting gov.kz, that the port would be deepened by 1.5 to 2 m with Jan De Nul equipment, to finish in the fourth quarter of 2025. The Astana Times reported on 13 October 2026 that the port administration gave the project as 20.6 billion tenge (US$45.6 million), financed by the Kazakh government and Ministry of Transport partly through loans, covering 77.1 hectares of port waters and about 1.3 million cubic metres, with China Harbour Engineering Company as general contractor and depths rising from 4.5–5 m to 6–7 m; the main phase began in October 2026 and is scheduled to finish at the end of 2026. The port administration said reports of a French company's involvement were incorrect and expected maritime cargo transport costs to fall by approximately 10–15%. The Astana Times (10 January 2026) separately reported Aktau annual dredging costs of roughly 400 million tenge, re-berthing of grain vessels at about 1 million tenge per ship, and an average Aktau depth of 4.5 m against 6.5–7 m needed for full operations.

A second Kuryk project, deepening port waters and the approach channel to five metres, was reported by the Times of Central Asia on 24 December 2025 as fully financed by ERSAI, using its own dredger, with dredging planned for January to June 2026 and no cost disclosed. The Times of Central Asia (9 September 2026) wrote that "Kazakhstan's infrastructure plan puts the cost of the Kuryk dredging project at approximately $56.8 million", that around $39.8 million "has been allocated for dredging the port waters" at Aktau, that Bautino dredging was planned at around $17.6 million, and that another approximately $65.2 million was planned for Berth No. 12 reconstruction and Berth No. 3 extension; the article summed the projects listed at roughly $179 million. That article also gives Kuryk as 1.7 million cubic metres and 8.5 m, which differs from Kazakhstan Temir Zholy's November 2024 figures.

In Azerbaijan, Reuters reported on 21 August 2025 that more than 250,000 cubic metres were dredged at the Dubendi oil terminal in 2024, that oil and oil-product transport there fell to 810,000 tons in the first half of 2025 from 880,000 tons a year earlier, and that Baku International Sea Port director Eldar Salakhov linked the fall to the lower water level; a new dredger, the Engineer Soltan Kazimov, was due in service. No cost was given. In Russia, Ports Europe reported on 28 May 2025 that the state agency Rosmorport had removed about 1 million cubic metres from the Volga-Caspian Sea Shipping Canal since 2 April against a 7 million cubic metre target for 2025; no cost or stated reason appeared in the part of the article that could be read. For shipping, Alakbar Azizli of the Azerbaijan Caspian Shipping Company said at Baku Climate Action Week that one of the company's ferries could carry only 80% of a full cargo load from Kazakhstan.

  1. 2023Kazakhstan's Transport Minister says urgent dredging at Kuryk will finish by July 2024 (Ports Europe, 13 December)
  2. 2024Kuryk dredging completed (announced 21 November): over 990,000 m3, 7–8 m depth
  3. 2024More than 250,000 m3 dredged at Baku's Dubendi oil terminal (reported by Reuters, 21 August 2025)
  4. 2025Rosmorport begins 2025 dredging of the Volga-Caspian canal on 2 April against a 7 million m3 target
  5. 2025Aktau port deepening by 1.5 to 2 m starts (reported 12 May)
  6. 2025ERSAI Kuryk deepening to five metres reported as privately financed (24 December)
  7. 2026Aktau main dredging phase begins in October; completion scheduled for the end of 2026 (Astana Times, 13 October)

What was said

Claims, in the words of those who made them.

“with dredging already implemented to keep passage for larger vessels open”

“Kazakhstan's infrastructure plan puts the cost of the Kuryk dredging project at approximately $56.8 million”

“the cost of maritime cargo transportation is expected to decrease by approximately 10-15%”

Aktau port administration, as quoted by the Astana Times · 13 October 2026 · The Astana Times

“one of the company's ferries can now carry only 80% of a full cargo load from Kazakhstan”

Where accounts differ

Each party's account, side by side, with its source. The record does not settle these points; it shows them.

Kuryk dredging volume and depth
Company or project
Kazakhstan Temir Zholy (21 November 2024)

Over 990,000 m3 removed; depth 7 to 8 m in the port and approach channel.

Kazakhstan Temir Zholy
Press and investigations
Times of Central Asia (9 September 2026)

Over 1.7 million m3 of soil removed and depth raised to 8.5 m.

The Times of Central Asia
Aktau dredging cost and contractor
Press and investigations
Astana Times (13 October 2026), citing the port administration

20.6 billion tenge (US$45.6 million); China Harbour Engineering Company is general contractor; reports of a French company's involvement were incorrect.

The Astana Times
Press and investigations
Times of Central Asia (9 September 2026 and 12 May 2025)

Around $39.8 million allocated for dredging the port waters; Jan De Nul supplied the dredging equipment (May 2025).

The Times of Central Asia

How it looked

What was shown, beside what was recorded.

Shown

  • Kuryk dredging described as completed "in record time" to allow vessels to reach full load, expand terminal capacity and support the Trans-Caspian route.
    Kazakhstan Temir Zholy press service · Kazakhstan Temir Zholy
  • Aktau dredging described as expected to cut maritime cargo transport costs by about 10–15% and raise Trans-Caspian cargo volumes by up to 30%.
    Aktau port administration, as reported by the Astana Times · The Astana Times

Recorded

  • Kuryk: over 990,000 m3 removed in four months, 7–8 m depth (Kazakhstan Temir Zholy, 21 November 2024); cost not stated.
  • Aktau: 20.6 billion tenge project, 77.1 hectares, about 1.3 million m3, depths 4.5–5 m to 6–7 m, main phase from October 2026 (Astana Times, 13 October 2026).
  • Dubendi terminal (Baku): more than 250,000 m3 dredged in 2024; throughput 810,000 tons in the first half of 2025 against 880,000 tons (Reuters).
  • Volga-Caspian Sea Shipping Canal: about 1 million m3 removed from 2 April to late May 2025 against a 7 million m3 target (Ports Europe).
  • No source reviewed gives a cost for the Azerbaijani or Russian dredging, or states how much of the Kazakh port spending is due to the falling sea rather than to capacity expansion.

In nature's name

What was promised in nature's name, the money that moved, and what was measured.

Money moved in nature's name

WhatKindAmountPeriod
Aktau port dredging project, as stated by the port administration (20.6 billion tenge; the Astana Times also states US$45.6 million; the Times of Central Asia gives about US$39.8 million)
Kazakh government and Ministry of Transport, partly through loans
The Astana Times
Budget20.6bn KZT2025–2026
Aktau port waters dredging, as allocated (no source named in the article; differs from the 20.6 billion tenge figure)
Not stated
The Times of Central Asia
Budget$40mnot stated
Kuryk dredging project cost, per Kazakhstan's infrastructure plan (the 2024 completion announcement gave no cost)
Not stated
The Times of Central Asia
Budget$57mnot stated
Bautino port dredging, planned (planned)
Not stated
The Times of Central Asia
Budget$18mplanned
Reconstruction of Berth No. 12 and extension of Berth No. 3 at Aktau, planned (berth works rather than dredging; the sources reviewed do not say how much is due to the falling sea)
Not stated
The Times of Central Asia
Budget$65mplanned
Aktau annual dredging costs (roughly 400 million tenge a year; the source also states US$782,870)
Not stated
The Astana Times
Spent400m KZTannual

Who gained

Money that reached nature, beside money that stayed elsewhere.

Reached nature or the ground

Not published
No figure published.

Gained elsewhere

Not totalled
Currency: KZT · Window: 2024–2026. All figures cover the same period. * Estimate built from cited figures.

Responses on record

  • Kazakhstan Temir Zholy (21 November 2024): Announced Kuryk dredging completed ahead of schedule, with over 990,000 m3 removed and 7–8 m depth, to allow full loading and terminal expansion; gave no cost. · Kazakhstan Temir Zholy
  • Aktau port administration (13 October 2026): Gave the dredging project as 20.6 billion tenge, said reports of a French company's involvement were incorrect, and expected cargo transport costs to fall by approximately 10–15%. · The Astana Times
  • Baku International Sea Port (21 August 2025): Its director Eldar Salakhov linked lower Dubendi terminal throughput to the falling water level, which requires major dredging. · Baird Maritime (Reuters)
  • Rosmorport (28 May 2025): Reported removing about 1 million m3 from the Volga-Caspian canal since 2 April 2025 against a 7 million m3 target; no further statement was read. · Ports Europe

In court and with insurers

Every proceeding and every insurer decision on record.

Lawsuits and rulings

No court case on record. No court has ruled on this case.

Insurers

No insurer decision on record.

What nature saw

Outcomes measured on the ground, and nature's note.

Nature's report opens this page. Below: further outcomes measured on the ground.

Aktau port average depth before dredging
4.5 m against 6.5–7 m needed
Astana Times, January 2026
Kuryk depth after 2024 dredging
7–8 m
Kazakhstan Temir Zholy, 21 November 2024
Ferry load from Kazakhstan
80% of a full cargo load
ASCO, via the Times of Central Asia, September 2026

What we don't know

Undisclosed, unproven, untried: recorded as data.

Nature

  • Not measured Harm to nature: The record holds no measurement of harm to nature.

Accounts

  • Disputed Kuryk dredging volume and depth
  • Disputed Aktau dredging cost and contractor

Record

  • None on record None on record in the sources reviewed: the cost of the Kuryk dredging completed in November 2024, the cost of the ERSAI Kuryk deepening, any cost for the Dubendi dredging, or any cost for Rosmorport's Volga-Caspian canal dredging.
  • None on record None on record in the sources reviewed: the environmental effect of port dredging on the seabed or on sturgeon and seals; no impact assessment of the port projects was found.
  • Disputed Disputed: Kuryk dredging. Kazakhstan Temir Zholy gave over 990,000 m3 and a depth of 7–8 m (November 2024); the Times of Central Asia (September 2026) gave 1.7 million m3 and 8.5 m.
  • Disputed Disputed: Aktau dredging cost and contractor. The Astana Times gave 20.6 billion tenge (US$45.6 million) and China Harbour Engineering Company; the Times of Central Asia gave US$39.8 million (September 2026) and, in May 2025, Jan De Nul equipment. The Times of Central Asia gave annual dredging expenses at Aktau of roughly US$880,000, against roughly 400 million tenge (US$782,870) a year in the Astana Times.
  • Unclear Unclear: how much of the roughly US$179 million total in the Times of Central Asia (the article's own sum, including a berth reconstruction) is due to the falling sea; the article does not apportion it.
  • Insufficient Unconfirmed: Rosmorport dredging of about 10 million m3 in 2023 for a 4.5 m draft and a 98 cm fall in 2006–2013 appeared only in search excerpts.

Did the harm stop?

The sources reviewed show the spending continuing: the main Aktau dredging phase began in October 2026 and the level was still falling according to the declarations and press reports of 2025–2026.

Who paid?

For Aktau, the Astana Times reported the Kazakh government and Ministry of Transport, partly through loans; for the ERSAI Kuryk deepening, ERSAI itself; for Rosmorport's canal dredging, the state agency Rosmorport (cost not stated). Payers for Kuryk 2024 and for Azerbaijan's Dubendi dredging are not stated in the sources reviewed.

Sources

Voices on record: ✓ Company or project— Government and regulators— Courts✓ Press and investigations— Communities and civil society✓ Researchers

Company or project

Connected cases

Related matters, and cases linked to this one through the same organisations, with the role each played in both.

Science and environment

Hectare (ha)
A unit of area equal to 10,000 square metres, about 2.5 acres. 100 hectares make one square kilometre.