My fig orchards 600–650 metres from a geothermal plant held more heavy metal in a 2015 doctoral thesis; the effect on yield and quality was smaller the further away they stood.
Did nature suffer? Yes. Harm is on record. Disputed
Recorded
  • In 2025 the Minister of Environment reported that the discharge of a geothermal plant was non-standard. Evrensel
What the record lacks: 4 none on record · 2 insufficient · 2 disputed See the gaps
Accounts of the harm differ
Does reinjection keep geothermal fluid out of the environment?
  • Company or project President of the Geothermal Energy Association (2021): Reinjection is carried out and water is not released to nature; reactions stopped the investment.
  • Government and regulators Minister of Environment (2025): The discharge of a geothermal plant was non-standard; an administrative and judicial process began. Evrensel
  • Researchers Literature and a 2015 doctoral thesis, as reported in the sources reviewed: The literature treats reinjection as a remedy; the thesis found higher heavy-metal levels in fig orchards 600–650 m from a plant.
Were the geothermal wells planned at suitable sites?
  • Courts Aydın 1st Administrative Court: Annulled the positive ÇED decision for the Sarı Zeybek plant for the second time (2022). bianet
  • Courts Aydın 2nd Administrative Court: Unanimously annulled the ÇED-not-required decision for drilling at Çamköy, citing a fig orchard and first-class land, proximity to an olive grove, cumulative effects and an error of about 3 km in the coordinates. Evrensel
  • Communities and civil society Kızılcaköy: Won the Sarı Zeybek case at the Aydın 1st Administrative Court. bianet
  • Communities and civil society Agricultural chamber (plaintiff at Çamköy): Won the Çamköy case at the Aydın 2nd Administrative Court. Evrensel
  • Company or project Plant owners: No response to the rulings is recorded in the sources reviewed.

In Aydın, Turkey's main fig-growing province, courts annulled environmental decisions for geothermal wells planned in fig orchards, and a minister reported a non-standard discharge from a geothermal plant. Plant owners are paid under a purchase guarantee set in Law 5346.

55.9%Aydın's share of Turkey's fig production
Ministry of Agriculture and Forestry fig market report, July 2025, as reported in the sources reviewed.

Status As of October 2026: two ÇED annulments by Aydın administrative courts; discharge process opened in 2025; no independent monitoring found.

What?
Courts annulled environmental assessment decisions for geothermal wells in fig-growing areas of Aydın, and a minister reported a non-standard discharge from a geothermal plant. bianet
Where?
Aydın, Turkey: Germencik, Çamköy, and the Sarı Zeybek site. bianet
When?
2022 to 2026. bianet
Who?
Gained
  • Geothermal plant owners, for example Margün — Paid under a 15-year purchase guarantee and a land-fee discount; Margün forecast about USD 172.8 million of EBITDA over 15 years. KAP (Public Disclosure Platform)
  • Project owners, intermediaries and offset buyers in the voluntary carbon market — Turkey sold about 35 million tCO2e in 2007–2015; a Menderes geothermal project forecast about 43,000 credits a year, and South Pole wrote that another plant became economic with carbon-credit sales.
Lost
  • Fig growers near plants — A 2015 thesis recorded higher heavy-metal levels in orchards 600–650 m from a plant.
Harmed
  • Fig orchards in Aydın — Heavy-metal levels in orchards near a plant; a non-standard discharge was reported in 2025; the size of the effect is not available. Evrensel
Why?
Geothermal power is supported in Turkey by a price guarantee and a land-fee discount under Law 5346; the research file records no line for the loss of figs.
How?
Plants and wells were permitted through ÇED decisions by the Ministry and governorate; villagers and the agricultural chamber challenged them in administrative courts. bianet
6 of 6 questions answered from the record

What happened

The record, in order.

In 2023 Turkey ranked first in the world for figs, at 356 thousand tonnes, and held 49% of the world's dried-fig share; 55.9% of Turkish production came from Aydın (Ministry of Agriculture and Forestry fig market report, July 2025, as reported in the sources reviewed). In the 2025/26 season dried-fig exports were 55 thousand tonnes worth USD 343 million, a figure the sources reviewed identify as the exporters' association's own declaration.

Geothermal power in Turkey is paid under Law 5346, which gives plants a price guarantee and an 85% discount on land fees. In 2026 a KAP (public disclosure platform) notice recorded that Margün bought a 24 MW geothermal plant in Germencik for USD 105.5 million, with a 15-year purchase guarantee of about 12.50 cents per kWh for five years and 10.50 cents afterwards; the company forecast about USD 172.8 million of EBITDA over 15 years. Nationally the research file records 68 geothermal plants with 1,772–1,786 MW installed (two sources give different figures) and 11.66 TWh generated in 2025, 3.2% of the total; it did not find a current plant count for Aydın.

Two court rulings concern wells in fig-growing areas. The Aydın 1st Administrative Court annulled, for the second time in 2022, the positive environmental impact assessment (ÇED) decision for the 54 MW Sarı Zeybek plant; press reports and the plaintiff said all of its wells were in fig orchards. In a ruling dated 2026, the Aydın 2nd Administrative Court unanimously annulled a decision that no ÇED was needed for drilling at Çamköy, citing fig orchards and first-class land, proximity to an olive grove, cumulative effects, and an error of about 3 km in the coordinates. The same company was given a positive ÇED decision for three wells in another village.

On the environmental record, the Minister of Environment reported in 2025 that the discharge of a geothermal plant was non-standard and an administrative and judicial process began; after an explosion in November 2025 the provincial directorate said it did not know the quantity of fluid that flowed. A 2015 doctoral thesis found higher heavy-metal levels in fig orchards 600–650 m from a plant, with the effect on yield and quality declining with distance; the figures themselves were not available in the sources reviewed. A peer-reviewed record of boron pollution dates from 2002.

The industry's account, given by the president of the Geothermal Energy Association in 2021, was that reinjection is carried out, that water is not released to nature, and that reactions had stopped the investment. The research file notes that the literature also treats reinjection as a remedy, while recording the 2025 non-standard discharge.

  1. 2002Peer-reviewed record of boron pollution (location not stated)
  2. 2015Doctoral thesis: heavy metal higher in fig orchards 600–650 m from a plant
  3. 2021Geothermal Energy Association president: reinjection is used, water is not released to nature
  4. 2022Aydın 1st Administrative Court annuls the Sarı Zeybek ÇED decision for the second time
  5. 2025Minister of Environment reports non-standard discharge from a geothermal plant; November explosion, provincial directorate unable to say how much fluid flowed
  6. 2026Aydın 2nd Administrative Court annuls the Çamköy ÇED-not-required decision; Margün disclosure of the Germencik plant purchase

What was said

Claims, in the words of those who made them.

Where accounts differ

Each party's account, side by side, with its source. The record does not settle these points; it shows them.

Does reinjection keep geothermal fluid out of the environment?
Company or project
President of the Geothermal Energy Association (2021)

Reinjection is carried out and water is not released to nature; reactions stopped the investment.

Government and regulators
Minister of Environment (2025)

The discharge of a geothermal plant was non-standard; an administrative and judicial process began.

Evrensel
Researchers
Literature and a 2015 doctoral thesis, as reported in the sources reviewed

The literature treats reinjection as a remedy; the thesis found higher heavy-metal levels in fig orchards 600–650 m from a plant.

Were the geothermal wells planned at suitable sites?
Courts
Aydın 1st Administrative Court

Annulled the positive ÇED decision for the Sarı Zeybek plant for the second time (2022).

bianet
Courts
Aydın 2nd Administrative Court

Unanimously annulled the ÇED-not-required decision for drilling at Çamköy, citing a fig orchard and first-class land, proximity to an olive grove, cumulative effects and an error of about 3 km in the coordinates.

Evrensel
Communities and civil society
Kızılcaköy

Won the Sarı Zeybek case at the Aydın 1st Administrative Court.

bianet
Communities and civil society
Agricultural chamber (plaintiff at Çamköy)

Won the Çamköy case at the Aydın 2nd Administrative Court.

Evrensel
Company or project
Plant owners

No response to the rulings is recorded in the sources reviewed.

How it looked

What was shown, beside what was recorded.

Shown

  • Reinjection is carried out and water is not released to nature; reactions stopped the investment.
    President of the Geothermal Energy Association, 2021

Recorded

  • Aydın 1st Administrative Court annulled the Sarı Zeybek ÇED decision for the second time (2022).
  • Aydın 2nd Administrative Court unanimously annulled the Çamköy ÇED-not-required decision (2026).
  • The Minister of Environment reported in 2025 that a geothermal plant's discharge was non-standard.
  • A 2015 doctoral thesis recorded higher heavy-metal levels in fig orchards 600–650 m from a plant.
  • A peer-reviewed article from 2002 records boron pollution (location not stated).

Who gained

Money that reached nature, beside money that stayed elsewhere.

Reached nature or the ground

Not published
No figure published.

Gained elsewhere

Not totalled
Currency: USD · Window: . All figures cover the same period. * Estimate built from cited figures.

Responses on record

  • margun (2026): KAP notice on the Germencik plant purchase: 24 MW, 15-year purchase guarantee, forecast of about USD 172.8 million EBITDA over 15 years. · KAP (Public Disclosure Platform)
  • geothermal-association-tr (2021): Its president said in 2021 that reinjection is carried out, water is not released to nature, and reactions stopped the investment.
  • tr-environment-ministry (2025): The Minister reported in 2025 that a geothermal plant's discharge was non-standard; an administrative and judicial process began. · Evrensel
  • tr-environment-ministry (2025-11): After the November 2025 explosion the provincial directorate said it did not know the quantity of fluid that flowed. · Evrensel

In court and with insurers

Every proceeding and every insurer decision on record.

Lawsuits and rulings

  1. 2022Claimant won
    Sarı Zeybek geothermal plant (54 MW): ÇED decision annulled
    Aydın 1st Administrative Court · Administrative · Kızılcaköy (as named in the report) → Not named

    The court annulled the positive ÇED decision for the second time. Press reports and the plaintiff said all of the wells were in fig orchards. bianet

  2. 2026Claimant won
    Çamköy drilling: ÇED-not-required decision annulled
    Aydın 2nd Administrative Court · Administrative · Agricultural chamber (plaintiff) → Not named

    The court unanimously annulled the decision that no ÇED was needed, citing a fig orchard and first-class land, proximity to an olive grove, cumulative effects and an error of about 3 km in the coordinates. The same company was given a positive ÇED decision for three wells in another village. Evrensel

  3. 2025–Ongoing
    Process following non-standard discharge from a geothermal plant
    Administrative and judicial authorities · Regulatory · Authorities (per the Minister's statement) → A geothermal plant (not named)

    The Minister of Environment reported in 2025 that a plant's discharge was non-standard and said an administrative and judicial process had been started. Evrensel

Insurers

No insurer decision on record.

What nature saw

Outcomes measured on the ground, and nature's note.

Nature's report opens this page. Below: further outcomes measured on the ground.

ÇED decisions annulled by courts
2
Sarı Zeybek (2022) and Çamköy (2026)
Heavy metal in fig orchards near a plant
Higher at 600–650 m
2015 doctoral thesis; the figures were not available in the sources reviewed
Independent yield and heavy-metal monitoring around plants
None found
Not found in the sources reviewed

What we don't know

Undisclosed, unproven, untried: recorded as data.

Nature

  • Disputed Does reinjection keep geothermal fluid out of the environment?
  • Disputed Were the geothermal wells planned at suitable sites?

Accounts

  • None on record Plant owners: No response to the rulings is recorded in the sources reviewed.

Record

  • None on record The size of the heavy-metal effect on figs near plants is not available: the figures from the 2015 thesis were not seen.
  • Insufficient A claim that cancer in Germencik is 4–5 times the Turkish average is reported but not verified: no underlying study is shown and no epidemiological record was found.
  • Insufficient A claim of boron pollution at '150 times' a limit is reported but not verified: the data could not be opened.
  • None on record After the November 2025 explosion, the provincial directorate said it did not know the quantity of fluid that flowed.
  • None on record A current count of geothermal plants in Aydın was not found.

Did the harm stop?

Two ÇED decisions were annulled in court (2022 and 2026); a minister reported a non-standard discharge in 2025 and a process began. Plants continue to operate; the same company received a positive ÇED decision for three wells in another village.

Who paid?

The purchase guarantee and land-fee discount are written into Law 5346 in cents per kWh and percent; the research file records no corresponding line for the loss of figs.

Sources

Voices on record: ✓ Company or project— Government and regulators— Courts✓ Press and investigations— Communities and civil society✓ Researchers

Company or project

Connected cases

Related matters, and cases linked to this one through the same organisations, with the role each played in both.

Bonds and banking

Guarantee
A commitment by a third party, often a development bank, to pay if the borrower does not.

Carbon and conservation finance

Carbon credit
A certificate representing one tonne of carbon dioxide (or equivalent) that a project says it reduced, avoided or removed. Buyers use credits to balance their own emissions in climate claims.
Offset
Using carbon credits to balance emissions released elsewhere, so that a buyer can claim lower or zero net emissions.
Voluntary carbon market
Trade in carbon credits bought by choice, mostly by companies, outside legally binding emission schemes.