Cases / Mining · Uzbekistan · 2017–2026

Almalyk MMC copper expansion: export-credit and bank financing, and a 48 billion soum environmental compensation demand

Nature's voice · report
Hazardous waste lay on open sites on my soil at Almalyk; Spot.uz reported in April 2026 that this harms soil and groundwater.
Did nature suffer? Yes. Harm is on record.
Recorded
  • At the Angren ore-management plant, worn treatment equipment meant that wastewater, in the article's words, "effectively turns into waste and is discharged into the Angren River". Spot.uz
What the record lacks: 2 none on record · 5 not disclosed See the gaps

Almalyk Mining and Metallurgical Complex is expanding its Yoshlik I copper project with foreign bank financing, including a US$ 2.55 billion KfW IPEX-Bank mandate and a UK Export Finance guarantee. In April 2026 the environmental regulator demanded 48 billion soums in compensation after an Ecopolice raid in which it named hazardous waste stored in the open and wastewater discharged into the Angren River.

48 bn soumsEnvironmental compensation demanded by the regulator, April 2026
National Committee on Ecology and Climate Change, after an Ecopolice raid; payment status not reported. Separate financing: US$ 2.55 billion KfW IPEX-Bank mandate (2023).

Status As of April 2026: the National Committee on Ecology and Climate Change demanded 48 billion soums in compensation and issued 20 mandatory orders; payment status and AMMC's response are not reported.

What?
AMMC is expanding its Yoshlik I copper project with foreign bank financing; in April 2026 the environmental regulator demanded 48 billion soums in compensation after an Ecopolice raid in which it named hazardous waste stored on open sites and wastewater discharged into the Angren River. Spot.uz
Where?
Almalyk, Tashkent region; Angren ore-management plant on the Angren River; Kalmakyr and Yoshlik I deposits. Spot.uz
When?
Financing 2017–2025; regulator demand reported 9 April 2026. Spot.uz
Who?
Gained
  • KfW IPEX-Bank — Mandated to work with AMMC on raising US$ 2.55 billion AMMC
  • Weir (UK) — Supplier of the automated machinery whose purchase the UKEF-guaranteed loan refinanced UK Government (UK Export Finance)
  • Fund for Reconstruction and Development of Uzbekistan — Lender of US$ 350 million for Yoshlik II Trend
Lost
  • AMMC — Faces a demand for 48 billion soums and 20 mandatory orders Spot.uz
Harmed
  • Soil and groundwater at Almalyk — Hazardous waste stored on open sites Spot.uz
  • Angren River — Wastewater discharged from the Angren ore-management plant Spot.uz
Why?
The financing is for expanding the copper smelting complex at the Yoshlik I deposit. AMMC
How?
A bank mandate (KfW IPEX-Bank), an export credit guarantee (UKEF) and planned Eurobonds; the regulator acted after an Ecopolice raid. UK Government (UK Export Finance)
6 of 6 questions answered from the record

What happened

The record, in order.

On 7 November 2023 the Almalyk Mining and Metallurgical Complex (AMMC) and KfW IPEX-Bank GmbH, a wholly owned subsidiary of KfW, agreed to work together on raising US$ 2.55 billion for the "Development of 'Yoshlik I' deposit" project, described as expanding the copper smelting complex. The AMMC page names no export credit agency and makes no environmental statements.

On 2 October 2024 UK Export Finance guaranteed a €12.6 million loan from an unnamed international bank to AMMC, to refinance automated machinery bought from Weir (UK). It was UKEF's first deal in Uzbekistan. The release gives no environmental or social classification.

On 16 January 2025 the presidential press secretary, Sherzod Asadov, said AMMC should issue US$ 1 billion in Eurobonds in 2025, out of US$ 2.1 billion planned across leading mining and metallurgy companies (Interfax); whether the bond was issued was not confirmed. An earlier project, Yoshlik II, was approved on 17 August 2017 at a cost of US$ 420 million, including a US$ 350 million loan from the Fund for Reconstruction and Development of Uzbekistan (Trend).

Spot.uz reported on 9 April 2026 that, after an Ecopolice raid, the National Committee on Ecology and Climate Change demanded "additional compensation in the amount of 48 billion soums" and issued 20 mandatory orders. The violations named were hazardous waste "stored on open sites", which the article says harms soil and groundwater, and, at the Angren ore-management plant, worn treatment equipment so that "wastewater effectively turns into waste and is discharged into the Angren River" (translated from Russian). The article gives no volumes or concentrations, and no AMMC response is reported.

  1. 2017Yoshlik II approved at US$ 420 million, including a US$ 350 million state fund loan (17 Aug)
  2. 2023AMMC and KfW IPEX-Bank agree to work on raising US$ 2.55 billion for Yoshlik I (7 Nov)
  3. 2024UKEF guarantees a €12.6 million loan to AMMC (2 Oct)
  4. 2025Presidential press secretary: AMMC should issue US$ 1 billion in Eurobonds (16 Jan)
  5. 2026National Committee on Ecology and Climate Change demands 48 bn soums and issues 20 mandatory orders (reported 9 Apr)

What was said

Claims, in the words of those who made them.

“UK businesses are more interested than ever in bringing their goods and services to this vibrant economy”

“additional compensation in the amount of 48 billion soums”

National Committee on Ecology and Climate Change, as reported by Spot.uz · 9 April 2026 · translated from Russian · Spot.uz

“wastewater effectively turns into waste and is discharged into the Angren River”

Spot.uz, on the Angren ore-management plant · 9 April 2026 · translated from Russian · Spot.uz

“should issue $1 billion in Eurobonds”

Presidential press secretary Sherzod Asadov, at a presidential meeting, on AMMC · 16 January 2025 · Interfax

How it looked

What was shown, beside what was recorded.

Shown

  • A US$ 2.55 billion financing mandate for expanding the copper smelting complex, with no environmental statement
    AMMC, 9 November 2023 · AMMC
  • UKEF's first deal in Uzbekistan, a €12.6 million guarantee, with no environmental classification stated
    UK Export Finance, 2 October 2024 · UK Government (UK Export Finance)

Recorded

  • National Committee on Ecology and Climate Change demanded 48 billion soums in compensation and issued 20 mandatory orders after an Ecopolice raid (April 2026).
  • Hazardous waste was stored on open sites; wastewater from the Angren ore-management plant was discharged into the Angren River (regulator findings reported by Spot.uz).
  • The AMMC release on the KfW IPEX-Bank mandate contains no environmental statements; the UKEF release gives no environmental or social classification.
  • Yoshlik II (2017): US$ 420 million, including a US$ 350 million loan from the Fund for Reconstruction and Development of Uzbekistan.

Who gained

Money that reached nature, beside money that stayed elsewhere.

Reached nature or the ground

Not published
Environmental compensation demanded by the regulator, April 2026—
Window: 2026
48 billion soums; whether it was paid is not reported.

Gained elsewhere

Not totalled
KfW IPEX-Bank mandate for Yoshlik I and the smelter (to raise)$2.5bn
Window: 2023
Eurobond issue AMMC should make in 2025 (plan)$1bn
Window: 2025
Out of US$ 2.1 billion planned across leading mining and metallurgy companies; issue not confirmed.
Yoshlik II project cost, including a US$ 350 million state fund loan$420m
Window: 2017
UKEF-guaranteed loan to AMMC—
Window: 2024
€12.6 million.
Currency: USD · Window: Mixed — see each line. Figures cover different periods and are not compared as a ratio. * Estimate built from cited figures.

Responses on record

  • uk-export-finance (2024-10-02): UK businesses are more interested than ever in bringing their goods and services to this vibrant economy (chief executive Tim Reid). · UK Government (UK Export Finance)

In court and with insurers

Every proceeding and every insurer decision on record.

Lawsuits and rulings

  1. 2026–OngoingUZS 48bn compensation demanded
    Compensation demand and mandatory orders against AMMC
    National Committee on Ecology and Climate Change (Ecopolice) · Administrative · National Committee on Ecology and Climate Change → Almalyk Mining and Metallurgical Complex (AMMC)

    After an Ecopolice raid, reported 9 April 2026, the Committee demanded 48 billion soums in additional compensation and issued 20 mandatory orders over hazardous waste stored on open sites and wastewater discharged into the Angren River. No court involvement is reported. Spot.uz

Insurers

No insurer decision on record.

What nature saw

Outcomes measured on the ground, and nature's note.

Nature's report opens this page. Below: further outcomes measured on the ground.

Compensation demanded
48 bn soums
National Committee on Ecology and Climate Change, April 2026
Mandatory orders
20
Issued with the demand
KfW IPEX-Bank mandate
US$ 2.55 bn
To raise financing for Yoshlik I (2023)

What we don't know

Undisclosed, unproven, untried: recorded as data.

Money

  • None on record Environmental compensation demanded by the regulator, April 2026 — 48 billion soums; whether it was paid is not reported.
  • None on record UKEF-guaranteed loan to AMMC — €12.6 million.

Record

  • Not disclosed Not disclosed: the legal basis of the 48 billion soum demand, emission figures for AMMC and AMMC's response; Spot.uz states none of them.
  • Not disclosed Not disclosed: payment status of the 48 billion soum compensation.
  • Not disclosed Not disclosed: environmental or social classification of the UKEF-guaranteed deal; the KfW IPEX-Bank release names no export credit agency.
  • Not disclosed Not disclosed: whether the 2025 Eurobond issue took place.
  • Not disclosed Not disclosed: volumes or concentrations of the hazardous waste and wastewater.

Did the harm stop?

Not stated. The regulator issued 20 mandatory orders in April 2026.

Who paid?

Not stated. Whether AMMC paid the 48 billion soum compensation is not reported.

Sources

Voices on record: ✓ Company or project✓ Government and regulators— Courts✓ Press and investigations— Communities and civil society— Researchers

Company or project

  1. KfW IPEX-Bank GmbH and AMMC
    AMMC · 2023-11-09

Government and regulators

  1. UKEF enters Uzbekistan markets with €12.6 million deal
    UK Government (UK Export Finance) · 2024-10-02

Connected cases

Related matters, and cases linked to this one through the same organisations, with the role each played in both.

Science and environment

Groundwater
Water held underground in soil and rock, drawn through wells.

Bonds and banking

Guarantee
A commitment by a third party, often a development bank, to pay if the borrower does not.